Laserfiche WebLink
L3Ibl,7 U'ar�ruw Ave ILI I:�]St <br /> NTI" Viva i Gl'ovi Height MIN J✓6 <br /> � ,L,� �J�ia'rl o- ��L4���J.�a .J�� Unearthingconfidence- <br /> NORTHERN <br /> 'TECHNOLOGIES,LLC www.NTigeo.com <br /> February 18, 2019 <br /> City of Centerville <br /> Attention: Mark Statz, PE <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> RE: Proposal for Geotechnical Services <br /> 7073 Centerville Road Development <br /> Centerville, Minnesota <br /> NTI Proposal P9095 <br /> We are pleased to submit our proposal to perform Geotechnical Services for the above referenced project. The <br /> purpose of this study is to collect representative soil samples, analyze the subsurface soil and groundwater <br /> conditions, and to furnish a preliminary geotechnical engineering report with preliminary design and <br /> construction recommendations. <br /> The proposed project concept is still under development but is likely to consist of an apartment building that is <br /> two to four stories in height and may have a below-grade basement level. The proposed project will also include <br /> the construction of the associated underground utilities and at grade parking/drive lanes. <br /> SCOPE OF WORK <br /> The following is our proposed work scope based on the request for proposal provided by the City of Centerville. <br /> NTI will mark the proposed boring locations. We will make you aware of these field activities before proceeding <br /> to the site to allow you the option to notify any pertinent parties prior to NTI's field work. <br /> NTI will contact the Minnesota "One-Call" system for clearance of public utilities within the area of the soil <br /> borings. NTI assumes that a representative of the owner will locate any existing private utilities that may be <br /> onsite. If the owner is unwilling or unable to locate the private utilities, NTI can provide a private locator. The <br /> cost of the locator would be a reimbursable expense and is not included within the fee indicated below. <br /> NTI will then mobilize a truck mounted drill to the site to drill two borings each to a depth of approximately 25 <br /> feet below existing grade. The total lineal feet of drilling proposed is 50 feet. Borings may be terminated early if <br /> soil/bedrock conditions resulting in practical auger refusal are encountered prior to the proposed termination <br /> depths. If soft soils,fill or organic soils are encountered near termination we will continue drilling a reasonable <br /> depth until a minimum of 10 feet of suitable foundation soils are observed. <br /> �>q <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> 91 <br />