Laserfiche WebLink
Proposal for Geotechnical Services <br /> 7073 Centerville Road Project <br /> Centerville, Minnesota <br /> Additional Item Cost <br /> Additional 25-foot deep borings at $650 per additional boring requested. <br /> The time of the original mobilization <br /> Additional Mobilizations $500 each <br /> Additional MDH permits $125 each <br /> Post report consultation, in excess of 2 hours $125 per hour <br /> Private Utility Locate Services Not Anticipated to be Needed. Cost plus 10 percent, if <br /> required. <br /> Other services Per our standard fee schedule, less 10% <br /> Our fees assume that the soil can be disposed of on site, such as by thin spreading near the borehole. Additional <br /> fees may apply for handling the spoils or for containerizing (drumming) spoils. Environmental hazard testing may <br /> be required for disposal to a landfill, if needed. <br /> NTI's fees assume that the work may be performed with standard construction Personal Protective Equipment <br /> (PPE), including hard hats, safety glasses, hearing protection and visibility equipment such as vests. If additional <br /> PPE is required, such as for drilling in an environmentally contaminated area or in a confined space, additional <br /> fees will apply. <br /> As of July 1, 2017, MDH has modified the requirements for abandonment of geotechnical soil bore holes. The <br /> new mandate requires that a bore hole permit application is submitted along with a sealing report for each site <br /> where borings deeper than 15 feet have been performed.Additionally, any boring 15 feet or greater must be <br /> sealed using bentonite grout.This proposal includes our fee for this additional requirement. <br /> SCHEDULE <br /> Upon receiving authorization to proceed, the field work will typically begin in approximately 8 to 12 business <br /> days and will take approximately 1 day to complete. The report will be issued to you within 7 to 10 business <br /> days of completion of the field work. Boring logs and verbal information regarding our findings can be provided <br /> within 2 to 3 days after the field work has been completed. <br /> ACCEPTANCE <br /> Please indicate your acceptance of this proposal by signing on the signature block below and returning a copy to <br /> us. The attached General Conditions are an integral part of this proposal. This proposal is effective until March <br /> 30, 2019. <br /> 94 <br />