Laserfiche WebLink
Olson's Sewer Service, Inc. • Olson's Excavating Service <br /> 17638 Lyons Street NE <br /> 10L Forest Lake, MN 55025 <br /> (651) 464-2082 . Fax: (651) 464-9029 <br /> PROPOSAL SUBMITTED TO PHONE DATE <br /> City of Centerville, ATTN: Ted 04/25/2019 <br /> STREET JOB NAME <br /> 1880 Main Street Ditch Cleaning and Drainage Improvement <br /> CITY,STATE AND ZIP CODE JOB LOCATION <br /> Centerville, MN 55038 <br /> ARCHITECT/DESIGNER DATE OF PLANS JOB PHONE <br /> City of Centerville <br /> We hereby submit specifications and estimates for: <br /> We will clean 140 feet of ditch to promote positive drainage to include clearing and grubbing 6 small trees and 3 <br /> clumps of brush. We will also haul away up to 96 cubic yards of excess soil for disposal. The excavated area <br /> will be seeded, fertilized, and covered in up to 300 square yards of two sided erosion blanket. The cost for this <br /> work is $4,912.40 <br /> We will saw cut the concrete and asphalt around the top of the lift station for access to excavate down past the <br /> first barrel section. We will remove the top barrel section, clean both sealing surfaces and reseal the two <br /> sections together. We will use 4-3/8 inch thick straps that are 16 inches long by 4 inches wide with 4 bolts each <br /> to secure the two barrel sections together. We will backfill the excavation area with the existing soil. The pump <br /> company will be responsible for disconnecting and reconnecting the electrical, pump and switches. The budget <br /> number for this job is $6,735.73 <br /> To stop the water from flowing under the culvert at 6888 Beaver Pond way we will access the area by going <br /> through Lamotte Park. I purpose digging up the pipe in the middle of the ditch bank by excavating 1 to 1 '/2 feet <br /> below the pipe. We will fill the trench 2 feet wide and 5 feet long on both sides of the pipe to the top of the pipe <br /> with up to 5 cubic yards of concrete. We will have to carry the concrete with skid-steers across Lamotte Park <br /> parking lot. We may have to create a bridge over the creek for access. The budget number for this job is <br /> $6,389.91 <br /> No concrete, asphalt or landscape restoration is included. No permits included. <br /> Any person or company supplying labor or materials for this improvement to your property may file a lien against <br /> your property if that person or company is not paid for the contributions. Under Minnesota law, you have the right <br /> to pay persons who supplied labor or materials for this improvement directly and deduct this amount from our <br /> contract price, or withhold the amounts due from us until 120 days after completion of the improvement unless we <br /> give you a lien waiver signed by persons who supplied the labor or material for the improvement and who gave you <br /> timely notice. We reserve the right to file a lien if payment in full is not received within 30 days of the invoice date. <br /> Any additional costs will be added to the bill for interest, legal expenses, attorney fees, and/or collection costs. <br /> We Propose hereby to furnish material and labor—complete in accordance with above specifications, for the sum of: <br /> AS NOTED ABOVE. <br /> Payment to be made as follows: <br /> TO BE PAID WITHIN 30 DAYS OF THE INVOICE. <br /> A SIGNED CONTRACT IS NECESSARY TO PERFORM THE WORK DESCRIBED ABOVE. <br /> All material is guaranteed to be as specified. All work to be completed in a workmanlike manner Authorized Signature <br /> according to standard practices. Any alteration or deviation from above specifications involving extra JON M. OLSON <br /> costs will be executed only upon written orders,and will become an extra charge over and above the <br /> estimate. All agreements contingent upon strikes,accidents or delays beyond our control. Owner to <br /> carry fire,tornado and other necessary insurance. Our workers are fully covered by Workmen's <br /> Com ensation insurance. Note: We may withdraw this proposal if not accepted within 30 days. <br /> Acceptance of Proposal —The above prices,specifications and <br /> conditions are satisfactory and are hereby accepted. You are authorized to Signature <br /> do the work as specified. Payment will be made as outlined above. <br /> Date of Acceptance Signature <br /> Keep Your Sewer in the Pink! www.olsonsinthepink.com <br />