Laserfiche WebLink
<br />May 28, 2019 <br /> <br /> <br />City of Centerville <br />Attention: Mark Statz, PE <br />1880 Main Street <br />Centerville, MN 55038 <br /> <br />RE: Proposal for Geotechnical Services <br /> Centerville Downtown Street and Utility Project <br /> Centerville, Minnesota <br /> <br /> NTI Proposal P9353 <br /> <br />We are pleased to submit our proposal to perform Geotechnical Services for the above referenced project. The <br />purpose of this study is to collect representative soil samples, analyze the subsurface soil and groundwater <br />conditions and to furnish a detailed geotechnical engineering report with appropriate design and construction <br />recommendations. <br /> <br />The proposed project consists of improving several downtown streets within the City of Centerville, Minnesota. <br />The improvements consist of the installation of water main and storm sewer lines along with the reconstruction <br />of the asphalt surface. <br /> <br />SCOPE OF WORK <br /> <br />The following is our proposed work scope based on the request for proposal provided by the City of Centerville. <br /> <br />NTI assumes a representative of the City will mark the proposed borings. If requested, NTI can mark the <br />proposed borings at the general locations indicated within the request for proposal documents. We will make <br />you aware of these field activities before proceeding to the site to allow you the option to notify any pertinent <br /> <br /> <br />NTI will - <br />borings. <br /> <br />NTI will then mobilize a truck mounted drill to the site to drill 9 borings each to a depth of approximately 14.5 <br />feet below existing grade. The total lineal feet of drilling proposed is 130.5 feet. Borings may be terminated <br />early if soil/bedrock conditions resulting in practical auger refusal are encountered prior to the proposed <br />termination depths. <br /> <br />31 <br /> <br />