My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2024
>
2019
>
2019-06-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:09:28 AM
Creation date
6/11/2019 11:09:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />May 28, 2019 <br /> <br /> <br />City of Centerville <br />Attention: Mark Statz, PE <br />1880 Main Street <br />Centerville, MN 55038 <br /> <br />RE: Proposal for Geotechnical Services <br /> Centerville Downtown Street and Utility Project <br /> Centerville, Minnesota <br /> <br /> NTI Proposal P9353 <br /> <br />We are pleased to submit our proposal to perform Geotechnical Services for the above referenced project. The <br />purpose of this study is to collect representative soil samples, analyze the subsurface soil and groundwater <br />conditions and to furnish a detailed geotechnical engineering report with appropriate design and construction <br />recommendations. <br /> <br />The proposed project consists of improving several downtown streets within the City of Centerville, Minnesota. <br />The improvements consist of the installation of water main and storm sewer lines along with the reconstruction <br />of the asphalt surface. <br /> <br />SCOPE OF WORK <br /> <br />The following is our proposed work scope based on the request for proposal provided by the City of Centerville. <br /> <br />NTI assumes a representative of the City will mark the proposed borings. If requested, NTI can mark the <br />proposed borings at the general locations indicated within the request for proposal documents. We will make <br />you aware of these field activities before proceeding to the site to allow you the option to notify any pertinent <br /> <br /> <br />NTI will - <br />borings. <br /> <br />NTI will then mobilize a truck mounted drill to the site to drill 9 borings each to a depth of approximately 14.5 <br />feet below existing grade. The total lineal feet of drilling proposed is 130.5 feet. Borings may be terminated <br />early if soil/bedrock conditions resulting in practical auger refusal are encountered prior to the proposed <br />termination depths. <br /> <br />31 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.