My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-19 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2019
>
2019-06-19 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 9:58:20 AM
Creation date
6/17/2019 9:58:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The cost of having the Scope of Work prepared shall be reimbursable to the applicant from the <br />loan proceeds. No RLGP loan will be approved until an adequate Scope of Work/Bidding <br />Document is submitted and approved by designated EDA staff. The applicant must receive and <br />submit at least two itemized competitive bids for all work to be completed and materials to be <br />purchased with the loan funds. The bids will be reviewed and filed by the financial institution to <br />establish that they are competitive and address the work identified in the Scope of Work. <br /> <br />The EDA, through the City Building Inspector, shall monitor the quality and progress of all work <br />funded through the Program. Request for payment (partial or final) by the applicant for <br />completed work and supplied materials shall be in writing to the financial institution. Partial <br />payments shall not exceed 90 percent of the total loan amount. The final payment shall be held <br />until a certificate of completion is obtained from the City and submitted to the financial <br />institution. <br /> <br />Upon submission and approval of a written request for the release of loan funds, designated EDA <br />staff will, in writing, authorize the financial institution to release the requested funds. <br /> <br />All work must be inspected by the City Building Inspector to ensure conformance with code and <br />must be verified for proper completion by City staff to ensure compliance with specifications <br />prior to final payment. The final inspection cannot be scheduled until all permits taken out have <br />been signed off by field inspectors. Upon satisfactory completion, a certificate of completion <br />will be granted. <br /> <br />All work must be completed within 12 months of issuance of a building permit unless written <br />permission of an extension is granted by designated EDA staff and financial institution. <br /> <br />All eligible improvement work performed pursuant to an approved RLGP loan must provide a <br />12-month warranty from the date of accepted completion by the loan recipient and the EDA. <br />This warranty must cover the quality of materials used and workmanship in performing the <br />work. This warranty is the responsibility of the recipient. <br />XIV. LOAN DISBURSEMENTS <br />Loan funds shall be released by the financial institution, but not before written approval from the <br />EDA is provided, and an RLGP check is issued. A minimum of 10 percent of the total loan will <br />be retained until all work is completed, inspected, and approved, as evidenced by current <br />certificate of completion. <br /> <br />XV. IMPROVEMENTS COMPLETED PRIOR TO LOAN CLOSING <br />Such improvements are not eligible unless the applicantÓs structure requires immediate attention <br />(hazardous code deficiencies, etc.) and the following steps are taken: <br /> Applicant must fill out a loan application with the financial institution. <br /> Applicant must submit a written request to the financial institution describing the need. <br /> Applicant must receive written permission from both the EDA and the financial institution. <br /> If the above conditions have been met, the applicant may proceed using his own funds or <br />interim financing from a financial institution. However, this is done at the applicantÓs and/or <br />6 <br />11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.