My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-06-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2006 12:02:11 PM
Creation date
6/23/2006 3:58:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br />53 TYPE LV 3 NON WEARING COURSE MIXTURE (B) TN 990 42.33 $0.00 <br />54 TYPE LV 3 WEARING COURSE MIXTURE (B) TN 750 43.86 $0.00 <br />55 BITUMINOUS MATERIAL FOR TACK COAT GAL 400 2.09 $0.00 <br />56 BITUMINOUS WEAR COURSE, TYPE 41A, TRAIL TN 75 53.55 $0.00 <br />57 SURMOUNTABLE CONCRETE CURB AND GUTTER LF 4600 8.06 $0.00 <br />58 TRUNCATED DOME PANEL SF 8 20.40 $0.00 <br />59 6" CONCRETE PEDISTRIAN CURB RAMP SF 60 5.10 $0.00 <br />60 4" PERFORATED POLYETHYLENE PIPE LF 4600 1.50 2700 2700 $4,050.00 <br />61 SKIDSTER (BOBCAT WITH OPERA TOR) HR 10 75.00 $0.00 <br />62 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 20 150.00 $0.00 <br />63 WATER FOR DUST CONTROL 1000 GAL 30 20.00 $0.00 <br />64 REM AND REPL CONC SIDEWALK- DUPRE ROAD SF 200 4.08 $0.00 <br />65 REM AND REPL CONC C & G- HUNTERS CROSSING 2NI LF 30 16.32 $0.00 <br />66 TEMP. ROCK CONSTRUCTION ENTRANCE TN 50 22.00 $0.00 <br />67 PROTECTION OF CB IN STREET - FURNISH AND <br /> INSTALL WIMCO EA 8 375.00 8 8 $3,000.00 <br /> TOTAL PART 5 - STREETS: $76,968.91 <br />CHANGE ORDER NO.1 <br />1 REMOVE BLACK DIRT OUT OF ROADBED LS 1142.50 1 1 $1,142.50 <br />2 MOVE BLACK DIRT FOR SERVICES LS 260.00 1 1 $260.00 <br />3 MOVE FENCE AND BRUSH LS 75.00 1 1 $75.00 <br />4 PLACING AND COMPACTING IMPORTED FILL LS 382.50 1 1 $382.50 <br />5 PRIME CONTRACTOR OVERHEAD 15% LS 279.00 1 1 $279.00 <br /> TOTAL CHANGE ORDER NO.1 $2,139.00 <br /> <br />TOTAL PART 1 - SANITARY SEWER: <br />TOTAL PART 2 - WATER MAIN: <br />TOTAL PART 3 - SERVICES: <br />TOTAL PART 4 - STORM SEWER: <br />TOTAL PART 5 - STREETS: <br />TOTAL CHANGE ORDER NO.1 <br />TOTAL WORK COMPLETED TO DATE <br /> <br />$56,757.00 <br />$67,885.25 <br />$46,648.50 <br />$40,877.02 <br />$76,968.91 <br />$2,139.00 <br />$291,275.68 <br /> <br />61605141REQ2.x1s <br /> <br />jL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.