My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-06-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2006 12:02:11 PM
Creation date
6/23/2006 3:58:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Centerville <br />Council Meeting Minutes <br />June 14,2006 <br />Mayor Capra indicated that people have used the argument that there is no sidewalk or <br />designated area to walk to get busing for their kids rather than having them walk. <br /> <br />City Administrator Larson asked for authorization to apply for some, all, or none. <br /> <br />Council Member Lee indicated he would like to stick with the first phase as it is too <br />expensive to do it all at once. <br /> <br />Council Member Paar indicated that the under crossing is the most important to him and <br />would service the most people especially since 14 is being reconstructed. <br /> <br />Council Member said he likes the idea but does not think the City can afford it or the <br />underpass but the underpass is necessary. He then said that he would like to apply for the <br />underpass but let them know that the intent is to do the northerly one as Phase ll. <br /> <br />Mayor Capra indicated she would like to see it as high and wide as possible for safety, if <br />it is possible to do. She then said that it may be possible to move it uphill because the <br />house on the corner may be removed as part of the road reconstruction project. <br /> <br />Council Member Terway thanked Staff for the suggestion and forward thinking but said <br />he feels the underpass is most important at this time and with the other projects going at <br />this time there is too much going on. <br /> <br />City Engineer Statz indicated that there has not been a formal feasibility report on this <br />and it may not be able to be done. <br /> <br />Moti(tD by C~unciJ, ,M_@r Terway. seconded ~ Co,.,eil M_J>>er faa~~ to <br />authorize the ,rant aoolieation for Safe Routes to School and list the proiects as <br />Rom," Q4 teConMI"f p."i~ with ~ unclerstaqC>>., ".t tll~ (:iJ,y w,n. to do <br />the orima" first and not linked tOllether. AD in favor. Motion earried <br />unanimouslY, <br /> <br />Council Member Lakso was not present for the vote. <br /> <br />vm. OLD BUSINESS <br /> <br />1. Consider Adoption of Resolution Making Contingent Award of a Contract for <br />Construction of 21st AvenueIBackage Road Proiect (Resolution #06-034) <br /> <br />Motion by Counell Member Lee. seconded by Counell Member Terway. to aoorove <br />Resolution #06-034. Awardin2 a Contract for Construction or 21st AvenuelBackalle <br />Road Proiect. AD in favor. Motion carried unanimouslY. <br /> <br />2. Centerville Redi-Mix Request for Watermain Extension <br /> <br />Page 6 of 10 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.