My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-08-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 7:20:26 AM
Creation date
8/12/2019 7:20:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/14/19 <br />Public Works/Engineering <br />VIII.1 <br />Downtown Street and Utility Improvements - Feasibility Report <br />Attached you will find a Feasibility Report, financing plan and resolution calling for a public hearing on the <br />2020 Downtown Street and Utility Improvements. This project is the final project to be completed from the <br />city's 2003 Pavement Management Plan. It would install water main to the only remaining neighborhood <br />without access to city water and reconstruct the streets in the downtown that have not been improved since the <br />sewer was installed in the early 1970's. <br />After reviewing the Feasibility Report and financing plan, the council should decide if they are ready to move <br />forward with the first of the two required hearings under MN State Statute Chapter 429, for special assessment <br />projects. <br />$2.4 M ($1.6 M Street Fund, Assessments; $0.5 M Water Fund; $0.3 M Stormwater Fund) <br />Motion to adopt Resolution 19-0XX Accepting the Feasibility Report and Calling for a Public Hearing. <br />Feas. Report; Finacing Plan <br />16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.