My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-08-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 7:20:26 AM
Creation date
8/12/2019 7:20:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY STUDY <br />1.0EXECUTIVE SUMMARY <br />The following is a summary of the findings of this report. <br />1.1RECOMMENDED IMPROVEMENTS <br />The streets identified in the proposed project area of downtown Centerville are in poor condition <br />and are overdue for repair. This project was first identified in the 2003 Pavement Management <br />Plan. Recently, the City of Centerville was awarded Anoka County Community Development <br />Block Grant funds to connect existing downtown properties to municipal water service. <br />Consequently, if the City of Centerville wishes to invest in improvements to this area, now is an <br />ideal time due to the available funding for extending water service to the area. It is the <br />recommendation of this report to complete these roadway and water main improvements <br />concurrently and utilize the available grant funding. In addition, the existing storm sewer system <br />will be replaced and expanded as necessary to improve drainage conditions. <br />The existing conditions of the sanitary sewer system in the project area have recently been <br />evaluated through the examination of the City’s regularly scheduled sewer televising program. <br />Based on that review, no sanitary sewer improvements are proposed with this project. <br />The proposed schedule calls for construction activity to begin in early 2020 with construction to <br />be completed in early 2021. <br />1.1.1Project Costs <br />The following table is a summary of the estimated total project costs based on the <br />recommended improvements: <br />TABLE 1 – PROJECT COSTS <br />TypeScopeTotal CostFunding Source <br />Street Fund/ <br />Street ImprovementsTotal Street Costs$1,585,940 <br />Bonds**/Assessments <br />Water MainTotal Water System Costs$494,053Grant/Water Fund <br />Storm SewerTotal Sewer System Costs$341,415Storm Sewer Fund <br />Total Potential Costs$2,421,407 <br />*Based on open cut installation of water main in conjunction with full street reconstruction. <br />**Only if needed. <br />City of Centerville <br />2020 Downtown Street and Utility Improvement Project <br />Project No.: 193804758 1 <br />21 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.