My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-08-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 7:20:26 AM
Creation date
8/12/2019 7:20:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY STUDY <br />2.0INTRODUCTION <br />The proposed 2020 Downtown Area Street and Utility Improvement Project is the final project <br />identified in the 2003 Pavement Management study. The study evaluated the existing condition <br />of all streets in the City and, based on these findings, outlined proposed improvements. A <br />graphical representation of this plan can be found in Figure 3. <br />The City of Centerville recently was awarded Anoka County Community Development Block <br />Grant funds for extension of municipal water service into this project area of downtown. <br />Performing water main installation and roadway reconstruction simultaneously will allow the City <br />to realize economic and construction efficiencies as compared to separate projects. <br />The streets in the project area are in poor to failing condition. Based on the roadway conditions, <br />a complete reconstruction of the streets is recommended as the most practical long-term <br />solution, which also helps economically facilitate the concurrent extension of water service to <br />the area. <br />Potential redevelopment within this downtown area was also taken into consideration with these <br />proposed improvements. With Block 7 redevelopment pending and other properties adjacent to <br />the project area zoned for redevelopment, this project is compatible with these potential future <br />redevelopments. <br /> City of Centerville <br /> 2020 Downtown Street and Utility Improvement Project <br />Project No.: 193804758 3 <br />23 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.