My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-08-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 7:20:26 AM
Creation date
8/12/2019 7:20:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY STUDY <br />using less of the capacity of the existing re-use system the runoff from this area will be <br />utilizing. <br />There are two areas within the project area where proposed roadway widths differ from the 28’ <br />wide typical section: <br /> Sorel Street west of Centerville Road from Centerville Road to the existing trail crossing <br />approximately mid-block.: A 34’ roadway width is proposed in order to accommodate on- <br />street parking in anticipation of future redevelopment. The roadway would be comprised <br />of a 14’ westbound lane, 12’ eastbound lane, and an 8’ wide parallel parking lane on the <br />south side of the roadway. This parking lane can accommodate approximately 5 parking <br />stalls. <br /> Centerville Road north of Main Street: The existing roadway width will be maintained at <br />approximately 44’ wide to accommodate school bus traffic, as well as on-street parking. <br /> City of Centerville <br /> 2020 Downtown Street and Utility Improvement Project <br />Project No.: 193804758 5 <br />25 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.