My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2019
>
2019-08-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 7:20:26 AM
Creation date
8/12/2019 7:20:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY STUDY <br />11.0 CONCLUSIONS AND RECOMMENDATIONS <br />It is the finding of this study that the proposed improvements are necessary, feasible and cost <br />effective from an engineering standpoint. The proposed improvements are feasible as they <br />relate to general engineering principles and construction procedures. The feasibility of the <br />project as a whole is subject to the financial review. The improvements proposed are necessary <br />to address the deteriorated pavement and drainage conditions. The improvements are cost <br />effective based on proven methods for street and utility construction. <br />Based on the information contained in this report, it is recommended that the City: <br /> Adopt this report as the guide for development of the proposed improvements. <br /> Hold a Public Improvement Hearing. <br /> Order the preparation of plans and specifications. <br /> Receive bids. <br /> Hold an Assessment Hearing <br /> Install the street, storm sewer and watermain/service, with construction anticipated to be <br />completed in 2021. <br /> City of Centerville <br /> 2020 Downtown Street and Utility Improvement Project <br />Project No.: 193804758 13 <br />33 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.