My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-18 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2019
>
2019-12-18 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2019 2:36:54 PM
Creation date
12/18/2019 2:36:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Centerville <br />EDA Meeting Minutes <br />October 23, 2019 <br />VII. OLD BUSINESS <br />1. None <br />VIII.NEW BUSINESS <br /> <br />1. Building Façade Grant Applicat <br />Administrator Statz presented the grant application received from JV Summit Corp, dba Southern <br />Rail to assist with the construction of a garage on the site of the Southern Rail bar. The applicants <br />were on hand to show a drawing of the proposed building. Its design included split face block, <br />hardi-board lap siding in the gables, and architectural shingles. The garage would replace the <br />existing garage on site and would be built in the same footprint. Because the garage would not <br />expand the footprint, there would not be any expansion of a legal non-conformity. Therefore, there <br />would be no requirement for the correction of other existing legal non-conformities such as an <br />unpaved parking lot or other issues with the building itself. The new garage would need to meet <br />current building codes. It would also be subject to the guidelines outlined in the Downtown <br />Redevelopment Master Plan referenced in the M-1 district in city code. This means that the <br />building would need to have architectural elements that enhance the character of the neighborhood. <br /> <br />Motion by Commission Member Love, seconded by Commission Member Giovinazzo to <br /> Loan and Grant Program (RLGP) to JV <br />Summit Corp dba Southern Rail (7082 Centerville Rd) for the construction of a garage, <br />conditioned on architectural approval by city staff and subject to the guidelines of the RLGP <br />and city code, including the Downtown Master Plan and Development Guidelines. All in <br />favor. Motion carried. <br />IX. ADJOURNMENT <br />Motion by Commission Member Hanzal, seconded by Commission Member Giovinazzo to <br />Adjourn the EDA meeting at 5:16 p.m. All in favor. Motion carried. <br />Respectfully submitted by EDA Secretary, Teresa Bender <br />Page 2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.