My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #19-035 - Approving Plans & Specs & Ordering Ad. for Bids
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2019
>
Res. #19-035 - Approving Plans & Specs & Ordering Ad. for Bids
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 10:49:57 AM
Creation date
12/19/2019 10:49:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec Consulting Services Inc. <br /> Stantec 733 Marquette Avenue Suite 1000,Minneapolis MN 55402-2309 <br /> December 5,2019 <br /> File: 193804758 <br /> Attention: Mr.Mark Statz,City AdministratorlEngineer <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville,MN 55038 <br /> Dear Mark, <br /> Reference:Approval of Plans/Authorization of Bidding for 2020 Downtown Area Street and Utility <br /> Improvements <br /> As requested,we have preparedplans and specifications for the 2020 Downtown AreaStreet and Utility <br /> P � tY <br /> Improvements project. The project generally consists of street reconstruction, storm sewer replacement, <br /> and water main installation in the residential area bordered by Centerville Lake to the west, Main Street <br /> (CSAH 14)to the north, Progress Road to the east, and Heritage street to the south; in addition to the block <br /> of Centerville Road north of Main Street. <br /> The total project costs for these improvements, including indirect costs, is currently estimated at <br /> $2,574,200. This compares to the feasibility report estimate of$2,421,407. The breakdown of estimated <br /> project costs and a comparison to the feasibility report estimates are shown in the table below. <br /> Improvement Type Funding Source Feasibility Report Current Cost <br /> Estimate Estimate <br /> Street Street Fund/Assessments $1,585,940 $1,569,600 <br /> Water Main Grant/Water Fund $494,053 $503,600 <br /> Storm Sewer Storm Sewer Fund $341,415 $501,000 <br /> Estimated Total Project Cost $2,421,407 $2,574,200 <br /> If the Council chooses to move forward with this project, we recommend that the City Council approve the <br /> plans and authorize advertisement for bids. This would allow bids to be opened on January 21, 2020,with <br /> the assessment hearing scheduled for February 26, and the consideration of contract award slated for <br /> Design with community in mind <br /> 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.