My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-07-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2006 2:49:52 PM
Creation date
7/7/2006 4:04:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~Y 16 ~ 04:00p <br /> <br /> <br /> <br /> <br />North Star Pump <br />Bob Crooks <br />24625 Iceland Palh <br />Lakevil1e, MN 55044 <br />phone 612-597-7373 <br />Fax: 952-469-5246 <br /> <br />robert crooks NORTH STAR <br /> <br />952 469 5246 <br /> <br />p.1 <br /> <br /> <br />May 16. 2006 <br /> <br />City of Centerville <br />Public Works <br /> <br />Ted and Paul, <br />Quote to replace guide system at lift station #3. Discharges and elbows are very worn. Quote <br />is to replace fiberglass I beam system with flygt 2" guide pipe system which I feel is the best and <br />easiest to use stem there is out there. <br /> <br />Quote to include 2 new discharge elbows, adapter flanges, fittings, brackets, bolts, anchors, and <br />guide pipe necessary for installation. Also includes all travel, mileage, and labor required. <br />Includes job site cleanup. Total with galvanized steel guide pipe. <br /> <br />$4,870.00 plus tax <br /> <br />Add $500.00 for stainless steel guide pipe. <br /> <br />Also I could re-sleeve your impellers at lift station #4 fO~ each in conjunction with the <br />above work. { ~~ <br />X'L- <br /> <br />Thank you, <br /> <br />~/ <br /> <br />Bob Crooks <br /> <br />-" <br /> <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.