My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-26 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2020
>
2020-02-26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2020 9:02:05 AM
Creation date
2/26/2020 9:02:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.ON.CIL:ETAD <br />00264 <br />SLIATEDNOITCURTSNOC <br />:ERUTANGIS <br />BCJ <br />DATE <br />193804960 <br />NOISNAPXENOITAGIRRIKRAPETTOMAL <br />:EMANTNIRP <br />LEGELHCS.MEILLEK <br />.ATOSENNIMFOETATSEHTFOSWALEHTREDNU <br />ATOSENNIM,ELLIVRETNEC <br />SHEET NUMBER <br />REENIGNELANOISSEFORPDESNECILYLUDAMAITAHTDNA <br />NOISIVREPUSTCERIDYMREDNUROEMYBDERAPERPSAW C8.01 <br />REVISION <br />TROPERRO,NOITACIFICEPS,NALPSIHTTAHTYFITRECYBEREHI <br />SURVEYDRAWNDESIGNEDCHECKEDAPPROVED <br />PROJ. NO. <br />NO <br />PLATE NO. <br />ERO-10 <br />APRIL 2017 <br />LAST REVISION: <br />27" <br />CATCH BASIN <br />IN-PLACE ELEVATION VIEW <br />ASSEMBLY <br />MANHOLE COVER BEEHIVE CASTING <br />INLET PROTECTION <br />POLYESTER SLEEVE <br />CENTERVILLE, MINNESOTA <br />FILTER ASSEMBLY <br />WIMCORD 27 <br />ROYAL ENTERPRISES - MODEL NO 27 INFRASAFE SEDIMENT CONTROLBARRIER - DG.PRE MANUFACTURED UNIT BY CIRCLE "H" ENTERPRISES. <br />ISOMETRIC VIEW <br />DEVICES TO BE INSTALLED IMMEDIATELY UPON INSTALLATION OF CONCRETESTRUCTURE CONE OR TOP SLAB.DEVICES SHOWN ARE AS MANUFACTURED BY WIMCO. MODEL NO. OF UNITSHOWN: RD 27.OTHER APPROVED <br /> INLET PROTECTION DEVICES FOR BEEHIVE CASTINGS ARE: <br />6" <br />PLATE NO. <br />ERO-5 <br />APRIL 2017 <br />LAST REVISION: <br />6" <br />"9 <br />"4 <br />1' TO 3' <br />8 STUDS 5/8"X11" <br />OVERLAP <br />LONGITUDINAL JOINTSMINIMUM OF 6" <br />"4 <br />3' MAX PIPE <br />FIRST SECTIONLENGTH <br />"2/17 <br />OVERLAP END JOINTSMINIMUM OF 6" AND STAPLEOVERLAP AT 1.5' INTERVALS. <br />3'-6" X 3'-6" X 1'-0"FTG. <br />(4)-#5 E.W. <br />VALVE ANDSPRINKLER BYOTHERS <br />TOP FLANGE <br />SLEEVED FITTING <br />HOOKED VERTS, #3 TIES @4" DIP <br />12" X 12" PIER W/ (4)-#610", (4) TIES @ 4" @ TOP <br />INSTALLATION <br />CENTERVILLE, MINNESOTA <br />EROSION CONTROL BLANKET <br />2' <br />F <br />O <br />1' <br />W <br />NO <br />LSPECIFICATIONS <br />O <br />IF <br />T <br />E <br />C <br />C6" <br />E <br />"6 <br />A"8/5 <br />R <br />F <br />I <br />R <br />D <br />U <br />S0 <br />FOLLOW MANUFACTURERSSPRINKLER FOUNDATION DETAIL <br />ANCHOR TRENCH <br />(SEE DETAIL AND NOTES BELOW) <br />A <br />STAPLE PATTERN/DENSITY SHALL <br />WITHOUT AN ANCHOR TRENCH <br />ANCHOR TRENCH4. BACKFILL WITH NATURAL SOIL AND COMPACT <br />2. LAY BLANKET IN TRENCH3. STAPLE AT 1.5' INTERVALS5. BLANKET LENGTH SHALL NOT EXCEED 100' <br />1. DIG 6" X 6" TRENCH <br />SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLUMPS,STICKS, VEHICLE IMPRINTS, AND GRASS. BLANKETS SHALL <br />NOTE:HAVE GOOD SOIL CONTACT. <br />"0-'8"6-'3 <br />PLATE NO. <br />ERO-1 <br />APRIL 2017 <br />LAST REVISION: <br />24" MINIMUMPOST EMBEDMENT <br />STEEL POSTS:ATTACH FABRIC TO POSTSWITH MINIMUM 3 ZIP TIESIN TOP 8" OF FABRIC.MONOFILAMENT GEOTEXTILEFABRIC PER MNDOT TABLE3886-1 (MACHINE SLICED). <br />(50 LB. TENSILE) PER POST <br />8"-12" DEPTH (PLUS 6" FLAP) <br />MACHINE SLICE <br /> INSTALLATION OF STEEL POSTS, <br />SILT FENCE <br />MACHINE SLICED <br />BEFORE <br />A <br />CENTERVILLE, MINNESOTA <br /> INSTALL THE POSTS AND PULL UP FABRIC TO ATTACH <br />W <br />THEN <br />O <br />L <br />F <br />E <br />C <br />A <br />F <br />MAXIMUM SPACING. <br />R <br />MINIMUM 5' LONG, 6'U <br />S <br />F <br />APPROVED OR DIRECTED BY THE CITY. <br />SILT FENCE INSTALLATION METHOD. HEAVY DUTY (ERO-1B) SILT <br />FENCE INSTALLATION METHODS SHOULD ONLY BE USED WHENLOCATED NEXT TO CURB AND GUTTER DUE TO SNOW PLOWING. <br />O <br />N <br />AFTER "SLICING" IN THE FABRIC ANDAT A UNIFORM HEIGHT. <br />NOTE:1. THE MACHINE SLICED METHOD (THIS DETAIL) IS THE STANDARD2. REMOVE SILT FENCE AFTER ESTABLISHMENT PERIOD IS MET.3.CITY WILL NOT BE RESPONSIBLE FOR DAMAGE TO SILT FENCECOMPACTION:DRIVE <br /> INSTALLATION EQUIPMENT OVER THE "SLICE" WHILE FABRIC IS LAYINGON THE GROUND. <br />STEEL FENCE POST (T-POST), <br />O <br />STEEL POSTS: <br />FROM FABRIC.I <br />TO FACE AWAYA <br />POST NOTCHES <br />T <br />C <br />E <br />R <br />I <br />D <br />RDRB_069408391,:sferX <br />.NEDDIBROFSICETNATSYBDEZIROHTUATAHTNAHTREHTOESOPRUPYNAROFESURO <br />gwd.108C069408391\\gwD\\DAC\\069408391\\evitca\\8391\\:V:emangniwarD <br />NOITCUDORPER.CETNATSFOYTREPORPEHTERASGNIWARDDNASNGISEDLLAOTSTHGIRYPOCEHT <br />mp44:2-0202/02/20:etaDtolP <br />.YALEDTUOHTIWCETNATSOTDETROPEREBLLAHSSNOISSIMOROSRORREYNA-GNIWARD <br />EHTELACSTONOD.SNOISNEMIDLLAROFELBISNOPSEREBDNAYFIREVLLAHSROTCARTNOCEHT <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.