My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-12 Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-07-12 Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 1:42:53 PM
Creation date
7/13/2006 11:43:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JUL-OT-06 02:02PM FROM-J-Craft <br /> <br />+320-398-6123 <br /> <br />T-727 P.012/020 F-504 <br /> <br /> <br />.r:..!' :'; <br />...n . <br />x= :: ':., , ,!l'.. <br />:: ,l.r" <br /> <br />.1': . <br /> <br />," <br /> <br />,.1;11 . <br />,I I . j= <br /> <br />: y'~~OORi'TO .p~~VIDE <br />,:: FOLLOWiNG tjETA't..; <br /> <br />:. 'I I. <br /> <br />!,: <br /> <br />Moldboard description <br /> <br />Falls SDL.1 OA Direct Hydraulic <br /> <br />RH Scraper Discharge mount (front post <br />behind scraper discharge) with push <br />brace located directly behind rear <br /> <br />30" high, straight moldboard, 10'6" <br />overall long, 10 ga A607-50 <br />construction, double boxed <br />reinforcements, rolled to 16%" radius. <br /> <br />Wing Plow - Make and Model <br /> <br />Where mounted on truck <br /> <br />Moldboard cutting edge description <br /> <br />Fixed' (non-tripping) frog (AASHTO <br />PUNCHED) with (1) piece 5/8" x G~' x 10' <br />srandMd cutting edge. "Note: Carbide <br />punchi~g available @ $NlC, but must be <br />requested upon order! <br /> <br />18" (level) at Front, 96" at rear; <br /> <br />Uft height <br />Hydraulic cylinder description <br /> <br />3Yz" dia with 2" dia chrome double <br />acting toe & heel cylinders, with direct <br />link front lift, and mechanical float <br />capabilitY at toe & heel <br /> <br />Warranty Detail 24 months from "In-Service" date <br /> <br />" . _ TOTAL PRICE ~626.0D <br /> <br />4.1 Installation of Wing Plow (includes painting, hoses, fittings, ~6~ <br />fasteners, & labor) ~~ <br /> <br />4.2 Dripless Quick Couplers in lieu of standard (per ea) <br />4.3 Trip Moldboard assembly in lieu of std fixed type <br />4.4 Trip Edge assembly in lieu of std fixed edge <br />4.5 Carbide cutting edge(s) 3/4" x 6" in lieu of Std <br />4.6 Decelleration (D-Cel) heel cylinder in lieu of standard <br /> <br />Price $53.00 <br />Price $11802.00 <br />Price $891.00 <br />Price $840.00 <br />Price $311.00 <br /> <br />4.7 Hydraulic "Nitro-Cush" extendable push bar. Requires Price $936.00 <br />additional double acting valve section. Heel section must be <br />a motor spool section with 500 psi port reliefs. Wing-Lac <br />valve must be added from hydraulic options. <br /> <br />4.8 Hydraulic ~Nitro-CushM extendable push bar (with cylin r <br />shaft protective sleeve). Requires additional double actin <br />valve section. Heel section must be a motor spool section <br />with 500 psi port reliefs. Wing-Lac valve must be added <br />from hydraulic options. <br /> <br />4.9 Left.Hand discharge in lieu of RH discharge Price $468.00 <br /> <br />4.10 Double Wing Adaption Assembly. NOTE: must figure (2) Price $698.00 <br />wings, double all wing option prices, include (1) of item 4.17 <br />above. in addition to this add-on. (requires additional <br />hydraulics also) <br /> <br /> <br />4.11 100% "sealed" moldboard in lieu of standard Price $144.00 <br /> <br />4.0 WING SDL-10A <br /> <br />Prepared by: .I-CRAFT <br /> <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.