My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-12 Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-07-12 Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 1:42:53 PM
Creation date
7/13/2006 11:43:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMO <br /> <br />\)~^'!) ~ <br /> <br />. t6.~r <br />(';rCJO'- w <br />pc:PS <br /> <br />qjvAC/c" ~.~ ~p <br />~ \.? ---- -'<" \ ' <br />-\ . '<l~ <br />\.)e. 'v.. "c..V" ~ <br /> <br />~ <br /> <br />,?cro <br />l.o ~\ SOO <br />.5 .., \ .--- <br />~J(.) V <br />. \g.. \ .... <br /> <br />Date: <br /> <br />10 July 2006 <br /> <br />To: <br /> <br />Dallas Larson, City Administrator <br /> <br />From: <br /> <br />Paul Palzer, Public Works Director/Building Official <br /> <br />~ <br /> <br />Re: Snowplow Replacement <br />+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ <br /> <br />I have received quotes through the state's vendor bid system for the replacement of the <br />1985 Ford plow and sander unit. The new truck would be a 2006 Sterling, similar to our <br />2001, but with many new updates. The ph\-v, box and }ighting would be an enhanced <br />system including a belly scraper, an elliptical box and a new LED lighting system, <br />eliminating the blinding effect of the current strobe system on the driver. Other upgrades <br />include a rear mounted wing plow verses a front mounted wing, relocation of the <br />hydraulic valve bank in a seal exterior box with the hydraulic tank mounted in front of <br />the box above the frame. The electronic controls of the sander will aut~matica\\:r ';',top <br />sanding when the truck comes to a stop. An aluminum fuel tank instead of steel and an <br />LED strobe on the end of the wing plow. <br /> <br />Both the new truck and components are much more user friendly and more reliable for <br />extended life of the vehicle. The total costs are below and the cost to repJace this same <br />truck in 2007 will be $18,000.00 - $20,000.00 due to the new pollution control devices on <br />the truck and a scheduled 15% increase for all of the body and plow components form J- <br />Craft. The other issue is that 2007 vehicles will only be able to run on new fuel, which is <br />not yet available, and will have higher maintenance costs associated with the new <br />pollution exhaust system. <br /> <br />I would recommend to that the Council approve the purchase of the new truck and <br />components as listed. The truck will take about 4 months for its build and the body, plow <br />and lighting another month. This would leave us with a deliver date in December if we <br />order by August 1 st. I would also like to change out the two front strobe lights 0,"1 the <br />2001 Sterling with the new LED lights due to the blinding glare of the strobes in the <br />mirrors of the driver (usually they drive with them off now due to this issue). This would <br />add another $1,500.00 to the final cost. <br /> <br />The total cost of the new truck without tax or delivery is $116,565.00, of which $5%,943- <br />is for the Sterling and $57,622.00 for the body, plow, sander and lighting components. <br />Total anticipated costs are about $120,000.00. The 2001 Sterling was about <br />$105,000.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.