Laserfiche WebLink
Centerville 2040 Comprehensive Plan <br /> <br /> <br />televised every ten years. During these inspections, services exhibiting constant clear water flows <br />are noted and investigated for possible illegal connections. <br /> <br />Table 41 Inflow and Infiltration Implementation Schedule <br />Item Time Period Cost Funding Source <br />2022-2025 $10,000/yr <br />Targeted Flow <br />Monitoring Utility <br />Follow-up, door to door, 2022-2025 $5,000/yr <br />sump pump inspections <br />based on flow monitoring <br />results <br />Wet weather, televising of 2026-2027 $10,000/yr <br />vulnerable areas <br />Follow up CIPP lining of 2028-2029 $100,000/yr <br />leaky areas identified by <br />TV inspection <br /> <br /> <br /> <br />S YSTEM C APACITY <br />By the end of the planning period (2040), the City anticipates full build-out of its undeveloped <br />from these small, remaining areas without further upgrade. Some trunk mains may need minor <br />extensions to reach the unsewered areas, but no upsizing will be required downstream to <br />accommodate these developments. <br />ection System includes gravity and force main pipes, Appendix A <br />also show schematic representations of future trunk main extensions to serve undeveloped <br />parcels. <br /> <br /> Page 89 <br /> <br /> <br />