Laserfiche WebLink
Stantec City of Centerville Page 6 of 7 <br />1880 Main Street Client Project Number: <br />Payment Number: 3 <br />Centerville, MN 55038 <br />Quantity <br />Amount <br />Line <br />Description <br />p <br />Units <br />Unit Price <br />Contract <br />This <br />This <br />Quantity <br />Amount To <br />Quantity <br />To Date <br />Date <br />Request <br />Request <br />80 <br />CONNECT DRAINTILE TO <br />EA <br />400.00 <br />6 <br />0 <br />0.00 <br />0 <br />0.00 <br />EXISTING STRUCTURE <br />81 <br />B618 CONCRETE CURB & <br />LF <br />14.50 <br />6100 <br />0 <br />0.00 <br />0 <br />0.00 <br />GUTTER <br />82 <br />4-INCHES THICK <br />SF <br />5.65 <br />3000 <br />0 <br />0.00 <br />0 <br />0.00 <br />CONCRETE SIDEWALK <br />6-INCHES THICK <br />83 <br />CONCRETE PEDESTRIAN <br />SF <br />10.15 <br />1000 <br />0 <br />0.00 <br />0 <br />0.00 <br />CURB RAMP <br />84 <br />6-INCHES THICK <br />SF <br />6.20 <br />2000 <br />0 <br />0.00 <br />0 <br />0.00 <br />CONCRETE DRIVEWAY <br />85 <br />8-INCHES THICK <br />SF <br />7.35 <br />1000 <br />0 <br />0.00 <br />0 <br />0.00 <br />CONCRETE DRIVEWAY <br />86 <br />CONCRETE STEPS <br />SF <br />1 31.00 <br />230 <br />0 <br />0.00 <br />0 <br />0.00 <br />87 <br />TRUNCATED DOME <br />SF <br />41.00 <br />240 <br />0 <br />0.00 <br />0 <br />0.00 <br />SURFACE <br />88 <br />SODDING, LAWN TYPE <br />SY <br />8.00 <br />6000 <br />0 <br />0.00 <br />0 <br />0.00 <br />89 <br />O\AM TOPSOIL BORROW <br />Cy <br />6.00 <br />1000 <br />0 <br />0.00 <br />0 <br />0.00 <br />90 <br />SEEDING WITH EROSION <br />Sy <br />5.00 <br />200 <br />0 <br />0.00 <br />300 <br />1,500.00 <br />CONTROL BLANKET <br />91 <br />4" SOLID WHITE LINE - <br />LF <br />2.00 <br />420 <br />0 <br />0.00 <br />0 <br />0.00 <br />EPDXY <br />92 <br />4" DOUBLE SOLID YELLOW <br />LF <br />3.00 <br />300 <br />0 <br />0.00 <br />0 <br />0.00 <br />LINE - EPDXY <br />PAVEMENT MARKING - <br />93 <br />ZEBRA CROSSWALK - <br />SF <br />6.00 <br />400 <br />0 <br />0.00 <br />0 <br />0.00 <br />WHITE <br />94 <br />STREET SWEEPER WITH <br />HR <br />120.00 <br />100 <br />0 <br />0.00 <br />0 <br />0.00 <br />PICKUP BROOM <br />Base Bid Totals: $127,185.25 <br />$319,942.15 <br />Project Category Totals <br />Project <br />Category <br />Amount This Request <br />Amount To Date <br />193804758 <br />PART A - GENERAL <br />0.00 <br />58,425.00 <br />193804758 <br />PART B - WATER MAIN <br />22,298.00 <br />122,504.00 <br />193804758 <br />PART C - WATER SERVICES <br />TO HOMES <br />0.00 <br />0.00 <br />193804758 <br />PART D -STORM SEWER <br />85,699.00 <br />86,245.00 <br />193804758 <br />PART E - STREETS <br />19,188.25 <br />52,768.15 <br />Contract Total <br />$405,557.21 <br />