Project Costs <br />A rough budget of $300,000 (excluding Audio-Visual upgrades) was established for a <br />limited scope renovation of City Hall. Bids have now been received and the project can <br />be constructed within that budget. However, it is helpful to look at the wholistic budget <br />for the project, adding in the A/V upgrades, construction contingencies, furnishings and a <br />few COVID and security related expenses not part of the original bid. Therefore, a total <br />project budget of $400,000 is contemplated. <br /> <br />ProjectCostSummary <br />ConstructionBaseBid$215,300 <br />AddAlternates(1,2,4,6&7)$41,300 <br />Architect/EngineeringFees$59,466 <br />ConstructionContingency(10%)$25,660 <br />Furniture$2,000 <br />SecuritySystem$10,000 <br />A/VUpgrades$46,273 <br />TotalProjectCost$399,999 <br />Financing Plan <br />The Council has also discussed a City Hall Renovation Project Financing Plan, although <br />a final plan was not adopted and was to be revisited upon receipt of bids for the work. <br />From our previous discussion: <br />An analysis of employee hours allocated to activities in the Water, Sewer, and <br />Storm Water funds shows that it would be appropriate, at a minimum, for 26% of <br />the remodel costs to be paid from these enterprise funds. <br />Additionally, the water department occupies, wholly, a space representing about <br />10% of the entire building (excluding the Fire Hall bay area). This space is for <br />chemical feed, metering, SCADA and other water-only functions. Therefore, an <br />additional 10% contribution from the Water Fund is proposed. <br /> <br />The Capital Equipment Fund has a current balance of roughly $250,000. It is <br />important to remember that this balance <br />Balance. This fund originally had items such as City Hall HVAC, carpet and <br />other similar items programmed into it. Therefore, it would be very appropriate <br />to take money from that fund to pay for the parts of this renovation project which <br />were specifically enumerated in our former Capital Improvement Plans (CIPs). <br />However, in our more recent updates to that <br />those items out, assuming they would come from general fund excess fund <br />balance. Therefore, if we use the Capital Equipment Fund to help pay for any of <br />the renovation project, we will need to adjust its CIP, and therefore, our annual <br />contribution to it, accordingly. This would be a sensible strategy, if the Council <br /> <br />