Laserfiche WebLink
ContractUnitCurrentQuantityAmount <br />No. <br />Item <br />UnitQuantityPriceQuantityto Dateto Date <br />BASE BID: <br />MOBILIZATION <br />1LS1$7,850.000.500.50$3,925.00 <br />TRAFFIC CONTROL <br />2 <br />LS1$2,050.000.200.20$410.00 <br />IRRIGATION SYSTEM, COMPLETE - BASE BID <br />3 <br />LS1$68,885.000.200.20$13,777.00 <br />IRRIGATION SLEEVE, DIRECTIONAL DRILLED <br />4 <br />LF80$30.00$0.00 <br />5EDUCATIONAL SIGNAGELS1$2,430.00$0.00 <br />6FLOW METER ELECTRICALLS1$4,825.00$0.00 <br />7LIGHTING AND RELATED ELECTRICALLS1$7,110.00$0.00 <br />8RESTORATIONLS1$9,440.00$0.00 <br />TOTAL BASE BID$18,112.00 <br />ALTERNATE NO. 1 : <br />IRRIGATION SYSTEM, COMPLETE - ALTERNATE NO. 1 <br />9LS1$5,025.000.200.20$1,005.00 <br />RESTORATION - ALTERNATE NO. 1 <br />10 <br />LS1$1,360.00$0.00 <br />TOTAL ALTERNATE 1 <br />$1,005.00 <br />ALTERNATE NO. 2: <br />IRRIGATION SYSTEM, COMPLETE - ALTERNATE NO. 2 <br />11LS1$26,495.000.200.20$5,299.00 <br />RESTORATION - ALTERNATE NO. 2 <br />12LS1$4,725.00$0.00 <br />TOTAL ALTERNATE 2 <br />$5,299.00 <br />TOTAL BASE BID$18,112.00 <br />TOTAL ALTERNATE NO. 1$1,005.00 <br />TOTAL ALTERNATE NO. 2$5,299.00 <br />TOTAL WORK COMPLETED TO DATE <br />$24,416.00 <br /> 193804951REQ1 <br /> <br />