My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-04 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2020
>
2020-11-04 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2020 2:14:42 PM
Creation date
10/30/2020 2:14:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General <br /> Yard Maintenance/Vermin <br /> <br />City-wide Clean-up Day <br />A City-wide Clean-up Day was held on Saturd <br />(Noon) at Laurie LaMotte Memorial Park. A total of 2642 lbs of appliances (18 units), 7.39 <br />tons of garbage, 2.53 tons of scrap metal, 5 tires and 31 bikes were taken in along with lots of <br />other trash and recycling. <br /> <br />A deadline has been set for the completion of a fence around the north and east side of the <br />wer property. <br /> <br />th <br />7129 20Ave. <br />The owner has contacted the city and will be submitting information on the lighting <br />fixtures he intends to use as replacements for the existing fixtures. <br /> <br />Rehbein Black Dirt Operation Interim Use Permit <br />The planning commission will further discuss future actions related to the Interim Use <br />Permit which is set to expire at the end of the year for the Rehbein Black Dirt Operation. <br /> <br />PUBLIC WORKS/STREETS <br />City Hall Renovation <br />The COVID-19 related office area improvements are nearing completion, with paint <br />and carpet set to be done by the end of the week (10/30). From there, the contractor <br />will move into construction of the renovation work in the City Council Chambers and <br />front lobby area. This work should wrap up by mid-January. <br /> <br />The City Council will be discussing a re-opening plan for City Hall at their upcoming <br />work session on October 28. <br /> <br />Trucks <br />The new trucks we ordered almost a year ago are now in production and have <br />anticipated ship dates in November. The two large plow trucks that were having work <br />done on their dump boxes are completed and in service, just in time. <br /> <br />Misc. <br />Public works staff have been busy with preparing winter equipment and supplies of salt <br />& brine. The water systems have been winterized and staff has assisted homeowner <br />associations with winterizing their irrigation systems. Satellites will be removed from <br />city parks next week. All staff are healthy and on a regular work schedule. <br /> <br />STORMWATER/WETLAND <br />LaMotte Park Stormwater Reuse System Expansion <br />All directional drilling work is complete and most of the irrigation pipe is installed. Heads <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.