Laserfiche WebLink
ContractUnitCurrentQuantityAmount <br />No. <br />Item <br />UnitQuantityPriceQuantityto Dateto Date <br />BASE BID: <br />MOBILIZATION <br />1LS1$7,850.000.101.00$7,850.00 <br />TRAFFIC CONTROL <br />2LS1$2,050.000.101.00$2,050.00 <br />IRRIGATION SYSTEM, COMPLETE - BASE BID <br />3LS1$68,885.000.201.00$68,885.00 <br />IRRIGATION SLEEVE, DIRECTIONAL DRILLED <br />4LF80$30.00-42.0098.00$2,940.00 <br />5EDUCATIONAL SIGNAGELS1$2,430.000.00$0.00 <br />6FLOW METER ELECTRICALLS1$4,825.000.201.00$4,825.00 <br />7LIGHTING AND RELATED ELECTRICALLS1$7,110.000.201.00$7,110.00 <br />8RESTORATIONLS1$9,440.000.201.00$9,440.00 <br />TOTAL BASE BID <br />$103,100.00 <br />ALTERNATE NO. 1 : <br />IRRIGATION SYSTEM, COMPLETE - ALTERNATE NO. 1 <br />9LS1$5,025.000.051.00$5,025.00 <br />RESTORATION - ALTERNATE NO. 1 <br />10LS1$1,360.000.201.00$1,360.00 <br />TOTAL ALTERNATE 1 <br />$6,385.00 <br />ALTERNATE NO. 2: <br />IRRIGATION SYSTEM, COMPLETE - ALTERNATE NO. 2 <br />11LS1$26,495.000.051.00$26,495.00 <br />RESTORATION - ALTERNATE NO. 2 <br />12LS1$4,725.000.21.00$4,725.00 <br />TOTAL ALTERNATE 2 <br />$31,220.00 <br />CHANGE ORDER NO. 1 <br />PART A: SPRAY GUN REVISIONS <br />1.00($4,500.00) <br />1REMOVAL OF 1 LARGE SPRAY GUN AND VALVE FROMLS1($4,500.00) <br />0.201.00$4,675.00 <br />2CONTRACTOR-SUPPLIED LARGE SPRAY GUN ANDLS1$4,675.00 <br />$175.00 <br />TOTAL PART A: SPRAY GUN REVISIONS <br />PART B: CHURCH IRRIGATION REVISIONS <br />0.201.00$0.00 <br />3REVISED IRRIGATION ON CHURCH/MCES PARCELSLS1$0.00 <br />$0.00 <br />TOTAL PART B: CHURCH IRRIGATION REVISIONS <br />PART C: ADDITION OF FLOW SENSOR <br />0.201.00$4,670.00 <br />4FLOW SENSOR AND ASSOCIATED WIRINGLS1$4,670.00 <br />$4,670.00 <br />TOTAL PART C: ADDITION OF FLOW SENSOR <br />PART D: SW SPRAY GUN REVISIONS <br />1.00($385.00) <br />5CREDIT FOR 3" PIPE AND 4" SADDLELS1($385.00) <br />1.00$720.48 <br />64" GATE VALVEEA1$720.48 <br />76" SADDLEEA1$616.001.00$616.00 <br />8ADDITIONAL PIPE SIZE AND LENGTHLS1$236.501.00$236.50 <br />9ADDITIONAL WIRINGLS1$176.001.00$176.00 <br />10ADDITIONAL LABORHR6$145.176.00$871.02 <br />TOTAL PART D: SW SPRAY GUN REVISIONS <br />$2,235.00 <br />CHANGE ORDER NO. 1 SUMMARY <br />PART A: SPRAY GUN REVISIONS$175.00 <br />PART B: CHURCH IRRIGATION REVISIONS$0.00 <br />PART C: ADDITION OF FLOW SENSOR$4,670.00 <br />PART D: SW SPRAY GUN REVISIONS$2,235.00 <br />TOTAL CHANGE ORDER NO. 1 <br />$7,080.00 <br />TOTAL BASE BID$103,100.00 <br />TOTAL ALTERNATE NO. 1$6,385.00 <br />TOTAL ALTERNATE NO. 2$31,220.00 <br />TOTAL CHANGE ORDER NO. 1$7,080.00 <br />TOTAL WORK COMPLETED TO DATE$147,785.00 <br /> 193804960REQ2 <br /> <br />