My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. #73 - Cable Franchise
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Ord. #73 - Cable Franchise
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 5:11:00 PM
Creation date
2/8/2021 5:04:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
relocated by the City at the cost of the Grantee. The City shall not be liable to the <br />Grantee for damages resulting from such removal, alteration or relocation. <br />SECTION 4. DESIGN PROVISIONS <br />4.1 System Facilities and Equipment. <br />4.1.1 Upon completion of the subscriber network System Upgrade, the System <br />generally shall have at least the following characteristics: <br />4.1.1.1 a modern design when built, utilizing an architecture that will <br />permit additional improvements necessary for high -quality and <br />reliable service throughout the Franchise term, and the capability <br />to operate continuously on a twenty-four (24) hour a day basis <br />without severe material degradation during operating conditions <br />typical to the Minneapolis/St. Paul metropolitan area; <br />4.1.1.2 standby power generating capacity at the headend. The Grantee <br />shall maintain motorized standby power generators capable of <br />powering all headend equipment for at least twenty-four (24) <br />hours. The back-up power supplies serving the System shall be <br />capable of providing power to the System for not less than three <br />(3) hours per occurrence measured on an annual basis according to <br />manufacturer specifications in the event of an electrical outage. <br />The Grantee shall maintain sufficient portable motorized <br />generators to be deployed in the event that the duration of a power <br />disruption is expected to exceed three (3) hours; <br />4.1.1.3 facilities of good and durable quality, generally used in high - <br />quality, reliable systems of similar design; <br />4.1.1.4 a System that conforms to or exceeds all applicable FCC technical <br />performance standards, as amended from time to time, which <br />standards are incorporated herein by reference, and any other <br />applicable technical performance standards. Upstream signals shall <br />at all times meet or exceed manufacturers' specifications for <br />successful operation of upstream equipment provided by the <br />Grantee or approved for use by the Grantee at any Subscriber's <br />premises. End of the line performance must meet or exceed FCC <br />specifications at the end of the Subscriber Drop; <br />4.1.1.5 a System shall, at all times, comply with applicable federal, State <br />and local rules, regulations, practices and guidelines pertaining to <br />the construction, upgrade, operation, extension and maintenance of <br />Cable Systems, including, by way of example (but not limitation): <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.