Subscriber PEG Fee amounts. Pursuant to the terms of the MOU, the amount of
<br />the PEG Fee may be increased annually by the CPI. During calendar year 2002,
<br />an estimated PEG Fee shall continue to be prepaid to the Commission on a
<br />quarterly basis, no later than thirty (30) days prior to the beginning of each
<br />calendar quarter. The estimated PEG Fee shall be reconciled annually to reflect
<br />actual PEG Fee receipts by the Grantee, subject to more frequent reconciliation
<br />ordered by the Commission. Any amounts due to the Commission as a result of a
<br />reconciliation shall be paid by the Grantee to the Commission within thirty (30)
<br />days following written notice to the Grantee by the Commission of the
<br />underpayment. If reconciliation discloses an overpayment by the Grantee, the
<br />Grantee may credit the amount of any overpayment against its next quarterly PEG
<br />Fee payment. Beginning in calendar year 2003, payments for the PEG Fee
<br />pursuant to this subsection shall be made quarterly based on actual receipts from
<br />the prior quarter on the same schedule as franchise fee payments.
<br />6.2.2 The Grantee shall provide the fiber-optic or other cabling and other electronics,
<br />equipment, software and other materials necessary to transport all PEG signals
<br />from their origination point to and from the Commission's master control to the
<br />appropriate subscriber network channel, including channels provided discretely.
<br />If the Commission's master control continues to be located at 1630 101't Avenue,
<br />NE, Blaine, MN, or if the Commission's master control is moved to a location up
<br />to 2,500 feet from the I -Net, the Grantee shall provide the aforementioned
<br />cabling, electronics, equipment, software and other materials at no cost to the
<br />City, the Commission, the North Metro Media Center, I -Net Users, Dark Fiber
<br />Infrastructure Users or Additional DFOI Users. Should the Commission re-
<br />locate its master control to a location that is more than 2,500 feet from the I -Net,
<br />the Grantee shall remain responsible for providing all cabling, electronics,
<br />equipment, software and materials necessary to transport all PEG signals from
<br />their origination point to and from the Commission's master control to the
<br />appropriate subscriber network channel; provided, however, that the Commission
<br />agrees to reimburse the Grantee for its Actual Costs in excess of the cost of the
<br />first 2,500 feet of construction and installation. The Grantee shall not take any
<br />action pursuant to this paragraph until notified, in writing, by the Commission of
<br />the intended location of the Commission's master control facility. Once notified
<br />by the Commission, in writing, of the intended location of the master control
<br />facility, the Grantee shall, within thirty (30) days of notification, prepare and
<br />tender for the Commission's review a design plan related to the transport,
<br />reception and routing of PEG signals to and from the master control facility. A
<br />cost estimate shall also be famished to the Commission, at the same time the
<br />design plan is submitted, if the selected master control facility site is not located
<br />at 16301018t Avenue, NE, Blaine, MN or within 2,500 feet of the I -Net. After the
<br />Commission has approved the design plan and cost estimate (if applicable), in
<br />writing, the Grantee shall construct, install and activate all cabling, other
<br />electronics, equipment, software and other materials necessary to provide the
<br />origination capabilities described in this subsection 6.2.2, such that the
<br />capabilities are fully in place and functional prior to operational startup at the
<br />34
<br />
|