Laserfiche WebLink
of additional amplifier cascades when the Commission, in its sole discretion, <br />determines that a particular cascade is not performing adequately. <br />7.1.9 Within sixty (60) days of the Effective Date, and throughout the Franchise term <br />thereafter (including any extensions thereof), the Grantee shall provide up to <br />twenty (20) modulators and demodulators, on an as needed basis, for the <br />provision of PEG programming at locations on the I -Net designated by the <br />Commission. If, at any time, it is determined that the I -Net is not meeting the <br />performance specifications for PEG programming, either as transmitted over the <br />I -Net, or as received by a Subscriber on the subscriber network, and standard <br />maintenance or repair activities cannot resolve the performance problem, then the <br />Grantee shall provide, at no charge to the City, the Commission or I -Net Users, <br />necessary fiber optic cabling, transmitters and receivers for the PEG access <br />origination connection that is transmitting the affected programming, if such an <br />action will resolve the performance problem. <br />7.1.10 The Grantee has made available to the City and the Commission for review a <br />detailed design map of the proposed Institutional Network construction plan, <br />including the following elements: (i) coaxial cable route; (ii) proposed fiber <br />route; (iii) location of Nodes serving the Institutional Network; (iv) the name and <br />location of facilities being served by such Nodes; and (v) the number of <br />amplifiers in each cascade within the Institutional Network. The Grantee has <br />taken the comments of the City and/or the Commission into account in <br />implementing the Institutional Network plan. <br />7.1.11 No I -Net Node shall be activated until it is tested, and the Grantee determines that <br />all applicable technical standards have been met or exceeded. Specifically, the <br />Grantee shall notify the Commission, or its designee, in writing, at least ten (10) <br />days in advance of completion of construction of each I -Net Node and BFC I -Net <br />site. The notice shall include the date the Grantee is prepared to conduct RF <br />noise, distortion, peak to valley and other tests according to FCC rules, NCTA <br />recommended practices or other acceptable test methodologies and other <br />applicable tests. The Commission or its designee shall have the option of <br />attending any tests conducted pursuant to this paragraph. All tests must be <br />successfully completed. The hybrid fiber -coaxial tests shall be deemed <br />successfully completed if specifications detailed in Exhibit B are met or bettered. <br />If any I -Net Node does not pass the Grantee's performance test, the Grantee shall <br />take all steps necessary to meet applicable standards, and the affected Node shall <br />be retested prior to activation. The Grantee shall send the Commission and the <br />City the results of each test conducted under this paragraph. <br />7.1.12 The Commission, or its designee, shall have the option of conducting a physical <br />inspection of the construction and connections to each BFC I -Net Site and each I - <br />Net Node. This inspection shall be conducted no later than the date of the test in <br />subsection 7.1.11. <br />91 <br />