Laserfiche WebLink
<br />MEMORANDUM of AGREEMENT <br />City of Centerville and the Rice Creek Watershed District <br /> <br />This Memorandum of Agreement (MOA) is made by the City of Centerville and the Rice Creek <br />Watershed District (RCWD), governmental subdivisions of the State of Minnesota. <br /> <br />Recitals and Statement of Purpose <br /> <br />A. Pursuant to Minnesota Statutes §§103B.211, 103D.341 and 103D.345, the RCWD has adopted <br />and implements Rule C, Stormwater Management Plans, which imposes water quality and runoff <br />retention requirements on land-disturbing projects. <br /> <br />B. Centerville has prepared a general redevelopment plan for its downtown area that will be <br />implemented in phases and through actions of the city, private property owners and redevelopers. <br /> <br />C. Centerville intends to expand a previously-constructed stormwater reuse facility ("Facility") <br />that uses existing Pond (identified as "existing pond" on attached Exhibit A) as a water supply for <br />irrigation of LaMotte Memorial Park, and wishes to use continue to use the Facility to satisfy water <br />quality and volume control requirements of District Rule C for properties that redevelop under <br />RCWD permits. <br /> <br />D. Construction of the Facility before redevelopment will ensure that stormwater flows from <br />redevelopment activities are timely managed and allow for operating levels to be observed by <br />Centerville and the RCWD. In order to proceed with construction, Centerville needs an adequate <br />assurance that the RCWD will accept use of the Facility by redeveloping properties to meet Rule C <br /> <br />requirements. <br /> <br /> <br />Terms <br /> <br />1. The following plans and specifications for the Facility are incorporated into this MOA: <br /> <br />Phase 1 (Contract A) Construction Plan Set (Sheets Gl.01, C2.01, CS.01-CS.03, C8.01, D2.0l) <br />for the stormwater reuse facility dated 10-6-2010. Plans include Temporary Erosion Control, <br />Storm Pipe Plan and Profile, Intake Area Plan and Detail, Wet Well Site Plan, Details, <br />Irrigation Plan and Details. <br />Phase 1 (Contract B) Construction Plan Set (Sheets Gl.01, CS.01, D2.01, El.01) for the wet <br />well site plan, details and electrical dated 10-6-2010. <br />Phase 1 (Contract C) Construction Plan Set (Sheets Gl.01, C2.0l, D2.01, Ll-1, Ll-2, Ll- <br />3) for the irrigation plan and details dated 10-6-2010. <br />2020 LaMotte Park Irrigation Expansion Construction Plan Set (Sheets G0.01-G0.01, C1.00, <br />C1.01-C1.02, C8.01-C8.02, E1.01)) for the for the Expansion of the Phase 1 irrigation plan <br />and details dated 3-4-2020. <br /> <br />Copies of these documents are maintained at Centerville and RCWD offices. <br /> <br /> <br /> <br />