My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-08-12 Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2020
>
2020-08-12 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 5:45:42 PM
Creation date
5/12/2021 5:45:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City-wide Clean-up Day <br />After canceling our originally scheduled City-wide Clean-up Day due to COVID, staff has <br />made some technology investments to reduce contact. A preliminary date of Saturday, <br />October 11 has been set for the rescheduled event. <br /> <br />General <br /> <br /> <br />Driveway and Parking Ordinance Review <br />The Planning and Zoning Commission will be considering changes to the residential outdoor <br />storage rules, such as those governing how many, and what type of vehicles can be parked on <br />a residential lot at any given time. <br /> <br />Changes to the driveway portion of the ordinance was adopted by the City Council and has <br />been published and put into our code. <br /> <br /> officials was held on 8/4 and produced <br />positive momentum. We are hopeful that a plan can be developed to mitigate noise. <br /> <br />th <br />7129 20Ave. <br />A letter from the city attorney was issued to the business owner allowing a final <br />opportunity to abate the lighting issues. <br /> <br />PUBLIC WORKS/STREETS <br />City Hall Renovation <br />A pre-bid meeting and project walk-through was held on August 4 to give potential <br />bidders an opportunity to view the space and ask questions of the architects and <br />engineers. A dozen or so interested contractors were in attendance. Bids for the <br />renovation project are due on August 13. <br /> <br />COVID-19 <br />A staff member has been mildly ill and has received a COVID test. We are awaiting <br />results. <br /> <br />STORMWATER/WETLAND <br />LaMotte Park Stormwater Reuse System Expansion <br />A preconstruction meeting was held on 7/28 to review the project with the contractor and <br />city staff. Work should begin in 3 to 4 weeks. Once started, the project should be <br />completed in about 2 weeks. <br /> <br />SEWER AND WATER <br />Wellhead Protection Plan <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.