My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-28 Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2018-11-28 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 5:30:50 AM
Creation date
5/13/2021 5:30:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECONOMIC DEVELOPMENT <br />Economic Development Authority <br />(our realtor) is scheduled to be there to <br />Quad Area Chamber of Commerce <br />onomic development efforts. <br /> <br />COMMUNITY DEVELOPMENT <br />Comp Plan <br />The Planning and Zoning Commission reviewed proposed changes to the draft <br />Comprehensive Plan related to housing density ranges. These changes allow for a more <br />realistic projection of the number of new homes that may be built on developable or <br />redevelopable land in the city. This information will be shared with the city council at <br />their next meeting, prior to final adoption of the comprehensive plan. <br /> <br />Peltier Estates <br />Staff received a call from an attorney for the developer, working on finalizing <br /> are hopeful this is a sign that the <br />development is moving forward towards construction. <br /> <br />Ruffridge Johnson <br />A ribbon cutting ceremony and open house has been scheduled for December 12, 2018 at <br />4:30 PM. All City Council are invited to attend. <br /> <br />Waterworks Site/DeFoe Property <br />Grading work is nearly complete. At the time of this report, utility work and road base <br />construction were within days of completion. It appears that construction will reach a <br />point which allows the issuance of building permits for model homes and/or homes <br />which have already been sold. <br /> <br />Old Mill Estates <br />We continue to work with the developer on various elements of the development process. <br />The two homes on the site have been raised and the site is now ready for grading. We <br />anticipate construction to begin in the spring. <br /> <br />Block 7 Property <br />The city continues to see interest in the site. Our realtor, Mike Brass has been in regular <br />contact with four separate parties. We anticipate at least three of those parties will follow <br />through with presenting a concept plan to the Planning Commission at the January <br />meeting. We will work with the EDA to plan a joint meeting with P&Z or a separate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.