My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-08-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2006 3:57:37 PM
Creation date
8/4/2006 3:57:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />as in' cd _....... DeIdIJd: split..... tile CiIf 8114 <br />__._______________....... ~ ~~tIle~of <br />......d.II...... IIUW _by..... <br />$000 f-L.:..:h procIulltof~f,\.~."..__lUlIDlf <br />. 0 WIl,N -maieDt. 11a4llllimaledpnal8&e of <br />~fIowtMm tile cq is '.I1Ud, <br />BiPt pnct (38%). 'Dallol8l oIiaibIe <br />estimatId CIOIIt oftllelllOrm_ is <br />$1,439,844.00 ofwbillh the esIimatecl <br />CIOIIt to tile CiIf Ie $547,140.12. <br /> <br />Anoka Co\mty CoIl1raGt No.2006-4Ssa <br /> <br />3. The City shall furnish and deliver to the CODStr:uction site repl~ <br />hydrants for 8DJ hydrants. which are being relocated as a part of this project. which want <br />replaced. <br /> <br /> <br />4. The City shaD provide construction observation for <br />reconstruction oftbeir utilities and approve for aeceptance the work as it is <br /> <br />4a. The City sba11 be respousible for any defici <br />relocation and reconstruction of the utilities that . <br />completion of the Project. <br /> <br />S. The City shall pay one <br />and non-eligible portion of the stonn sewer <br />of stonn sewer CODStruction. Stonn sewer <br />basins. manholes. castiDgs. rip rap. inlet <br />outlet structures and grit chambers and/or co <br />eligible and eligible portions are defined in the <br /> <br />the cost of concrete curb and <br />total cost of curb and gutter <br />st is 1115,222.00. <br /> <br />(1000A.) of the cost of decorative <br />~Ated cost for decDrative median is <br /> <br />percent (100%) of the cost ofstreetscape <br />... plantings. trees,. tree pes, street lights. stamped <br />City ohooses to include with the Project. The <br />lioeDsed lAQd-.ape architect and meet the Anoka County <br />Guidelines. The City's estimated cost for <br /> <br />The City shall pay one hundred percent (100%) of the cost of new <br />. us driveway pavement for aU upgraded driveways. The City's estimated <br />is $6,345.00. <br /> <br />Any in place driveway pavement dismpted by the construction will be <br />by the County at DO cost to the City. <br /> <br />3 <br /> <br />/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.