Laserfiche WebLink
14. CLEAN UP. The Developer shall daily clean dirt and debris from streets that has <br />resulted from construction work by the Developer, its contractors, subcontractors, agents or <br />assigns. Prior to any construction on the Land, the Developer shall identify in writing a responsible <br />party for erosion control, street cleaning, and street sweeping. During such times as construction <br />is active, developer or his agent shall frequently inspect streets and make sure that they are swept <br />of dirt and debris. <br />15. SITE PROVISIONS. <br />A. Developer shall be responsible for security at the Land during construction. <br />B. Developer shall maintain communication with the neighboring properties and <br />address any concerns raised by the neighbors in a timely manner. <br />C. Developer shall repair damage to the neighboring streets, curbs, trails, or other <br />public infrastructure caused by construction of the Project, at their own expense. <br />D. Developer shall provide traffic control for any work within the right-of-way. <br />E. During construction of Michaud Way, Developer shall require all construction <br />traffic to enter a construction site from an existing roadway (either 20th or 21st Avenues or Main <br />Street) until such time as a base course is constructed, and at no time after a final wear course is <br />installed. Temporary access to a site can occur north of the pond on 21st Avenue. <br />16. OWNERSHIP OF IMPROVEMENTS. Upon completion and acceptance of the <br />work and construction required by this Agreement, the Public Improvements lying within public <br />right-of-way and easements shall become City Property without further notice or action. Those <br />improvements shall include but are not limited to the sanitary sewer, potable water system, storm <br />sewer, roads, sidewalks, trails, draintile, signage and street lighting (unless owned by the utility). <br />The extent of sewer and water service lines ownership is further defined in city code. The <br />Developer shall retain ownership and maintain all ponds and other erosion control measures, and <br />the Final Plat shall indicate an easement in favor of the Public for storm water use, access, and <br />maintenance. However, the Developer shall maintain ponds and other erosion control measures <br />until the development is complete in conformance with this Agreement, and provided that the <br />Version 08/20/2021 for Council packet Page 10 <br />