My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2021
>
2021-09-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2021 6:15:03 PM
Creation date
9/17/2021 6:14:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proceeding with construction of the Improvements.The Developer, at its sole expense,shall <br />instruct its engineer to provide adequate field inspection personnel to assure an acceptable level of <br />City acceptance, that the construction work for the Improvements meet the approved City <br />standards. <br />The Developer, its contractors,and subcontractors, shall follow all instructions received <br />from the City and Rice Creek Watershed inspectors, so long as in conformity with the Plans.The <br />-site projectmanagement.The Developer or its engineer <br />shall schedule a pre-construction meeting at a mutually agreeable time and location with all parties <br />concerned, including the CityEngineer, inspectorand/or consultants, to review the program for <br />the constructionwork.Prior to the pre-construction meeting, Developer shall supply a schedule of <br />construction activities and shall amend the schedule from time to time as necessary. Before the <br />Security for the completion of Public Improvements is released in total, ironmonuments must be <br />installed in accordance with Minn. Stat. Chapter 505. <br />written notice to the City certifying that the monuments have been installed. <br />8.PERMITS.The Developer shall obtain,or require its contractors and <br />subcontractors to obtain,all necessary permits. Those permits obtained by Developerto begin <br />workinclude,butare not limited to: <br />A.Minnesota Pollution Control Agency National Pollutant Discharge Elimination <br />SystemPermit ForStormWater Discharge Related To Construction Activity <br />B.Rice Creek Watershed DistrictGeneral Permit For Development Activity <br />C.City of Centerville-Building Permit <br />D.City of CentervilleGrading Permit for land disturbing activities. <br />E.City of Centerville Right-of-Way Permits for small utilities such as gas, phone, <br />electric, cable TV. <br />F.Minnesota Pollution Control AgencySanitary Sewer Extension <br />G.Minnesota Department of Health Water Main Extension <br />Version 09/17/2021 Page 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.