My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2021
>
2021-09-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2021 6:15:03 PM
Creation date
9/17/2021 6:14:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
responsibility for procurement and installation of same. The cost of street lighting, street signs, <br />and traffic sign installation is set forth in the attached table, Exhibit D. <br />B.Within 60 days after Developer delivers a complete set <br />a <br />public improvements and a letter requesting acceptance by the City of such improvements, City <br />shall review said improvements and consent to and accept the public improvements or provide <br />Developer with a written notice of work that is unacceptable and what is required to make the work <br />acceptable to the City. Upon completion of corrections to the unacceptable work, the developer <br />shall, again, notify the Cityin writing and request acceptance of the work. The timeline above, <br />then resets. If the City fails to provide a written notice of unacceptable work within 30days, then <br />the City shall be deemed to have accepted the public improvements <br />written request for acceptance. <br />C.The Developer warrants all Improvements required to be constructed by it pursuant <br />to this Agreement against poor material and faulty workmanship.The warranty period for <br />underground utilities istwo years from the date of acceptance by the City.If all Improvements <br />are installed by one contractor, the warranty period shall commence afterthe final wear course has <br />been completed and the City has accepted the streets unlessinstallation of the wear course has <br />been delayed by the City, in which case the two-year period shall commence on the later of <br />November 1, 2023, or the requested extension date requested by Developer pursuant to Section 9 <br />herein. If streets and underground utilities are installed by separate contractors, the two (2) year <br />warranty period on underground utilities shall commence following their completion and <br />acceptance by the City. The Developer or his contractor shall post security in the amount of thirty- <br />five percent (35%) of final construction costs to secure the warranties. The Developer or his <br />Version 09/17/2021 Page 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.