My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2021
>
2021-10-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2021 1:32:30 PM
Creation date
10/11/2021 1:32:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the work. The timeline above, then resets. If the City fails to provide a written notice of <br />unacceptable work within 30 days, then the City shall be deemed to have accepted the public <br /> <br /> C. The Developer warrants all Improvements required to be constructed by it pursuant <br />to this Agreement against poor material and faulty workmanship. The warranty period for <br />underground utilities is two years from the date of acceptance by the City. If all Improvements <br />are installed by one contractor, the warranty period shall commence after the final wear course has <br />been completed and the City has accepted the streets unless installation of the wear course has <br />been delayed by the City, in which case the two-year period shall commence on the later of <br />November 1, 2022, or the requested extension date requested by Developer pursuant to Section 9 <br />herein. If streets and underground utilities are installed by separate contractors, the two (2) year <br />warranty period on underground utilities shall commence following their completion and <br />acceptance by the City. The Developer or his contractor shall post security in the amount of thirty- <br />five percent (35%) of final construction costs to secure the warranties. The Developer or his <br />contractor may use the existing Letter of CreditSecurity on file with the City, or a maintenance <br />bond to satisfy this condition. The City standard specifications for utilities and street construction <br />identify the procedures for final acceptance of streets and utilities. <br />D. The Developer shall submit the Final Plat, construction plans <br />plans in electronic format. The electronic format shall be either AutoCAD, .DWG file or a .DXF <br />file using Anoka County coordinates. The Developer shall also submit two (2) complete sets of <br />the final plat and construction plans on paper (22 x 34 or 24 x 36). The Developer is responsible <br />for supplying the county with appropriately formatted plat documents per their requirements. <br />Version 10/11/2021 Page 15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.