Laserfiche WebLink
<br />the work. The timeline above, then resets. If the City fails to provide a written notice of <br />unacceptable work within 30 days, then the City shall be deemed to have accepted the public <br /> <br /> C. The Developer warrants all Improvements required to be constructed by it pursuant <br />to this Agreement against poor material and faulty workmanship. The warranty period for <br />underground utilities is two years from the date of acceptance by the City. If all Improvements <br />are installed by one contractor, the warranty period shall commence after the final wear course has <br />been completed and the City has accepted the streets unless installation of the wear course has <br />been delayed by the City, in which case the two-year period shall commence on the later of <br />November 1, 2022, or the requested extension date requested by Developer pursuant to Section 9 <br />herein. If streets and underground utilities are installed by separate contractors, the two (2) year <br />warranty period on underground utilities shall commence following their completion and <br />acceptance by the City. The Developer or his contractor shall post security in the amount of thirty- <br />five percent (35%) of final construction costs to secure the warranties. The Developer or his <br />contractor may use the existing Letter of CreditSecurity on file with the City, or a maintenance <br />bond to satisfy this condition. The City standard specifications for utilities and street construction <br />identify the procedures for final acceptance of streets and utilities. <br />D. The Developer shall submit the Final Plat, construction plans <br />plans in electronic format. The electronic format shall be either AutoCAD, .DWG file or a .DXF <br />file using Anoka County coordinates. The Developer shall also submit two (2) complete sets of <br />the final plat and construction plans on paper (22 x 34 or 24 x 36). The Developer is responsible <br />for supplying the county with appropriately formatted plat documents per their requirements. <br />Version 10/11/2021 Page 15 <br /> <br />