Laserfiche WebLink
V. Common open space <br />Public open space <br />Streets <br />❖ Off street parking and loading areas <br />❖ Commercial use <br />•.• Office use <br />Industrial use <br />Proposed completion schedule, including staging or phasing of the development <br />Buildable Acreage Calculations Worksheet <br />Preliminary Grading, Drainage, and Erosion Control Plan.. All elevations and contours shall be based <br />❑on NAVD-1988 <br />Off-street parking system plan with detailed parking calculations showing that the minimum parking <br />requirements are being met <br />Preliminary Utility Plan <br />Preliminary Lighting Plan <br />A detailed traffic impact analysis of the proposed development <br />Estimate of population to occupy the site, with breakdown to number of children, adults and families. <br />Application fee and escrow <br />APPLICATION MUST BE PRESENTED WITH FIVE LARGE COPIES OF PLANS AND TEN <br />COPIES OF PLANS SIZE 11 X 17 <br />Page 3 of 5 <br />PUD Apphcation.docx Vers. 20I4-05-10 <br />