My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-10 Admin. Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2021
>
2021-11-10 Admin. Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 11:37:38 AM
Creation date
11/9/2021 11:37:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Inquiries <br /> Additional inquiries from Brew Pub developer <br /> Apartment developer inquiries <br /> Bakery looking for potential locations <br /> Distribution Center looking at industrial land <br /> <br />Rehbein Commercial <br />Infrastructure work is now, largely complete, with the sewer, water and stormwater having <br />been installed. The street (Michaud Way) has been constructed up through the base course of <br />asphalt. The wearing course will be installed next year if there are no settlements or other <br />issues. The contractor is working through punch list items and will be completing the trail <br />and sidewalks next year. <br /> <br />Kwik Trip <br />The owner has communicated that construction could begin by mid-summer, 2022. <br /> <br />Norbella Senior Living <br />Norbella has now broken ground on the site, installing utilities and excavating for the <br />foundation and parking lot. Work will continue in an effort to enclose the building for winter <br />work on the interior. <br /> <br />Peterson Shores <br />The developer has signed necessary agreements and is authorized to file the plat. <br />Rehbein Industrial <br />Work on the extension of Fairview Street has begun, with the installation of sewer service <br />stubs and water main. Storm sewer and street construction will follow, weather permitting. <br />Sutton Transport <br />The site has been graded and is ready for construction, once agreements are finalized. <br /> <br />2050/2070 Main Street <br />The Planning and Zoning Commission held a <br />public hearing on a proposed Rezoning and <br />Conditional Use Permit for a proposed Building <br />Supply Yard for the former Northern Forest <br />Products building and the adjacent, vacant lot. <br />The Planning Commission recommended <br />approval of both proposed zoning applications. <br />The Rezoning would change the properties from <br />a B-2 (Main St. Commercial) zoning to a B-1 <br />(Commercial). This zoning allows a limited amount of outdoor storage. The proposed user <br />would remediate debris-filled <br />soils on the vacant lot and make <br />a substantial investment in the <br />existing building. Landscaping <br />and other updates to the site <br />would also be included. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.