My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-17 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2021
>
2021-11-17 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2021 7:01:00 AM
Creation date
11/16/2021 7:00:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City is in discussion with the homeowner near the cul-de-sac on Old Mill Court, exploring <br />alternative routes for the trail. The city will continue to hold security for the completion of the <br />trail until this process plays out and the trail link can be completed. <br /> <br />th <br /> <br />Centerville Storage (20Ave. Mini Storage) <br />With the site fully paved and landscaped, the developer is just waiting on a fence to complete the site <br />and open for business. <br /> <br />Bay View Villas (Waterworks Site) <br />The vast majority of the project work is now done. Some lakeshore plantings and final <br />landscaping items remain. Mailboxes are now in and the pond has been dredged to final grade. <br /> <br />Atlas Villas Memory Care Project (1825 Main Street) <br />Site work is complete with the exception of sodding. Work on the interior continues. No <br />word yet on a grand opening date. <br /> <br />Development Inquiries <br /> Additional inquiries from Brew Pub developer <br /> Apartment developer inquiries <br /> Bakery looking for potential locations <br /> Distribution Center looking at industrial land <br /> <br />Rehbein Commercial <br />Infrastructure work is now, largely complete, with the sewer, water and stormwater having <br />been installed. The street (Michaud Way) has been constructed up through the base course of <br />asphalt. The wearing course will be installed next year if there are no settlements or other <br />issues. The contractor is working through punch list items and will be completing the trail <br />and sidewalks next year. <br /> <br />Kwik Trip <br />The owner has communicated that construction could begin by mid-summer, 2022. <br /> <br />Norbella Senior Living <br />Norbella has now broken ground on the site, installing utilities and excavating for the <br />foundation and parking lot. Work will continue in an effort to enclose the building for winter <br />work on the interior. <br /> <br />Peterson Shores <br />The developer has signed necessary agreements and is authorized to file the plat. <br />Rehbein Industrial <br />Work on the extension of Fairview Street has begun, with the installation of sewer service <br />stubs and water main. Storm sewer and street construction will follow, weather permitting. <br />Sutton Transport <br />The site has been graded and is ready for construction, once agreements are finalized. <br /> <br />2050/2070 Main Street <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.