My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-01 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2021
>
2021-12-01 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2021 12:08:25 PM
Creation date
11/30/2021 12:08:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7. Size and Layout of Similar Facilities and References <br />Describe relevant experience and provide information on at least three (3) reference <br />projects completed in the last six (6) years in similar climates to Minnesota. Provide <br />references and contact information including phone number and email addresses. <br />8. Submit a Design of your Proposed Skate Park. <br />Submit a design that fits in the scope of the bid. This should not be examples of skate <br />parks that have been already created. Submit a uniquely designed skate park for <br />Carpenter Park. <br />9. Total Project Cost with Separated Design and Construction Cost <br />The project cost, not to exceed $230,000, should be separated as follows: <br />a. Detailed design cost including number of city meetings, number of detailed drawings, <br />etc. <br />b. Detailed construction cost including cost of materials, labor, etc. <br />Proposals that do not include a ÒNot to ExceedÓ cost will be disregarded without further <br />consideration. It is the responsibility of the proposing firm to accurately predict the <br />amount of time they require for services. <br />10. Insurance Certificate <br />The Contractor shall provide proof of comprehensive general liability insurance in <br />accordance with Section 466.04 of the Minnesota Statutes. <br />11. Additional Information <br />Include any other information that is believed to be pertinent, but not specifically <br />requested elsewhere in this RFP. <br />Section 5 Contractor Selection <br />Proposals will be reviewed and evaluated by City staff and the Skate Park sub-committee and <br />based on the following criteria: <br />1. Consulting firm and key project staff experience. <br />2. Proven track record in successfully completing similar projects on time and within <br />budget. Successful experience of the firm and the individual team members will be <br />considered. <br />3. Proposed approach to completing the project. <br />4. Proposed project schedule. <br />5. Skate Park design specifically created for Carpenter Park. <br />6. Proposed design and construction cost. <br />7. References. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.