My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-19 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2022
>
2022-01-19 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2022 9:20:04 AM
Creation date
1/17/2022 9:19:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Development Inquiries <br /> Additional inquiries from Brew Pub developer <br /> Apartment developer inquiries <br /> Bakery looking for potential locations <br /> Distribution Center looking at industrial land <br /> <br />Rehbein Commercial <br />Infrastructure work is now, largely complete, with the sewer, water and stormwater having <br />been installed. The street (Michaud Way) has been constructed up through the base course of <br />asphalt. The wearing course will be installed next year if there are no settlements or other <br />issues. The contractor is working through punch list items and will be completing the trail <br />and sidewalks next year. <br /> <br />Kwik Trip <br />The owner has communicated that construction could begin by mid-summer, 2022. <br /> <br />Norbella Senior Living <br />Norbella has now broken ground on the site, installing utilities and excavating for the <br />foundation and parking lot. Work will continue in an effort to enclose the building for winter <br />work on the interior. <br /> <br />Peterson Shores <br />The developer has signed necessary agreements and is authorized to file the plat. <br />Rehbein Industrial <br />Work on the extension of Fairview Street has begun, with the installation of sewer service <br />stubs and water main. Storm sewer and street construction will follow, weather permitting. <br />Sutton Transport <br />The site has been graded and is ready for construction, once agreements are finalized. <br /> <br />2050/2070 Main Street <br />A permit has been issued for roofing of the building in preparation of the tenant. <br />CODE ENFORCEMENT Î RESIDENTIAL <br />General <br /> Sidewalk clearing. <br /> <br />COMMUNITY ENGAGEMENT <br />Web Site <br />Social Media <br /> AdministratorÓs Report uploaded Center Stage <br /> Committee Agendas/Packets uploaded Meeting Agendas <br /> <br /> Public Hearings <br />Reader Board <br /> Job Posting Î Rink Attendants <br /> Meeting Schedules <br /> <br /> Community Events <br />Community Email List <br /> AdministratorÓs Report <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.