My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-01 Administrator/Engineer's Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2022
>
2022-01-01 Administrator/Engineer's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 7:14:34 AM
Creation date
1/18/2022 7:14:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bay View Villas (Waterworks Site) <br />The vast majority of the project work is now done. Some lakeshore plantings and final <br />landscaping items remain. Mailboxes are now in and the pond has been dredged to final grade. <br /> <br />Atlas Villas Memory Care Project (1825 Main Street) <br />Interior work on the building continues. <br /> <br />Development Inquiries <br /> Additional inquiries from Brew Pub developer <br /> Apartment developer inquiries <br /> <br />Rehbein Commercial <br />Infrastructure work is now, largely complete, with the sewer, water and stormwater having <br />been installed. The street (Michaud Way) has been constructed up through the base course of <br />asphalt. The wearing course will be installed next year if there are no settlements or other <br />issues. The contractor is working through punch list items and will be completing the trail <br />and sidewalks next year. <br /> <br />Kwik Trip <br />The owner has communicated that construction could begin by mid-summer, 2022. <br /> <br />Norbella Senior Living <br />Norbella has now broken ground on the site, installing utilities and excavating for the <br />foundation and parking lot. Work will continue within the building through the winter. <br /> <br />Peterson Shores <br />The developer has signed necessary agreements and is authorized to file the plat. <br />Rehbein Industrial <br />Work on the extension of Fairview Street has been completed, up through the gravel base of <br />the road, including sewer, water and stormwater utilities. Curb and paving will follow in the <br />Spring. <br />Sutton Transport <br />The site has been graded and is ready for construction, once agreements are finalized. <br /> <br />2050/2070 Main Street <br />A permit has been issued for roofing of the building in preparation of the tenant. <br />A rezoning and Conditional Use Permit were approved, pending the sale of the property to a <br />Building Material Supply Center. The user would largely sell to builders and contractors, but <br />will have a public showroom and sales counter. If the sale goes through, we would expect to <br />see a site plan review application soon. <br />CODE ENFORCEMENT Î RESIDENTIAL <br />General <br /> Sidewalk clearing. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.