My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. #122, Second Series - 2022 Fee Schedule
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Ord. #122, Second Series - 2022 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:06:04 PM
Creation date
1/20/2022 1:04:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Two percent (2%) of the total cost of labor and materials of the heating, <br />ventilation and air conditioning work to be completed or a minimum of $40 <br />whichever is greater. <br /> <br /> Work commenced without first obtaining a permit shall be charged an investigative fee <br /> equal to permit fees, in addition to normal permit fees. <br /> <br /> Sprinkler/Fire Suppression system permits: <br /> <br /> Single Family, Flat fee $400 <br /> Fire Suppression Permit Minimum $75 <br /> <br />Other sprinkler/fire suppression permits. All Fire Code related permits/inspections - contract cost <br />of sprinkler/fire suppression system times 3.25% (Includes plan review by Building Official and <br />Fire Department). <br /> <br />All of the above stated fees are Subject to State of MN surcharge fees. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 16 of 21 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.