My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-26 Administrator Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2022
>
2022-01-26 Administrator Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 6:04:02 AM
Creation date
1/24/2022 6:03:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
committed to moving forward with all of the aforementioned processes. <br /> <br />Centerville Elementary School Expansion <br />Construction continues to be on schedule. <br /> <br />stnd <br />Old Mill Estates 1 and 2 Additions <br />The developer has requested a Letter of Credit reduction and it will be before Council at their <br />January 26, 2022 meeting for consideration. <br /> <br />The City is in discussion with the homeowner near the cul-de-sac on Old Mill Court, exploring <br />alternative routes for the trail. The city will continue to hold security for the completion of the <br />trail until this process plays out and the trail link is completed. <br /> <br />th <br />Centerville Storage (20Ave. Mini Storage) <br />Work on the site is substantially complete. The city is awaiting word from the owner on an <br />expected opening date. <br /> <br />Bay View Villas (Waterworks Site) <br />The vast majority of the project work is now done. Some lakeshore plantings and final <br />landscaping items remain. Mailboxes are now in and the pond has been dredged to final grade. <br /> <br />Atlas Villas Memory Care Project (1825 Main Street) <br />Contractors have been experiencing delays due to material shortages but they anticipate being <br />open by April 1, 2022. <br /> <br />Development Inquiries <br /> None <br /> <br />Rehbein Commercial <br />Infrastructure work is now, largely complete, with the sewer, water and stormwater having <br />been installed. The street (Michaud Way) has been constructed up through the base course of <br />asphalt. The wearing course will be installed next year if there are no settlements or other <br />issues. The contractor is working through punch list items and will be completing the trail and <br />sidewalks next year. <br /> <br />Kwik Trip <br />The owner has communicated that construction could begin by mid-summer, 2022. <br /> <br />Norbella Senior Living <br />Norbella has now broken ground on the site, installing utilities and excavating for the <br />foundation and parking lot. Work will continue within the building through the winter. <br /> <br />Peterson Shores <br />The developer has signed necessary agreements and is authorized to file the plat. <br />Rehbein Industrial <br />Work on the extension of Fairview Street has been completed, up through the gravel base of <br />the road, including sewer, water and stormwater utilities. Curb and paving will follow in the <br />Spring. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.