My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-01 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2022
>
2022-02-01 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 5:18:38 PM
Creation date
1/28/2022 5:17:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
February 1, 2022 <br />Centerville Planning & Zoning Commission <br />Page 3 of 9 <br />RE: Max Storage Ï Conditional Use Permit, Site Plan <br /> <br /> <br />PROPOSED PROJECT/RELATIONSHIP TO ZONING CODE STANDARDS <br />The Max Storage project proposes two buildings on the 1.56-acre site. Each building is 50Ô x 208Ô, or <br />10,400 sq ft, 20,800 sq ft total. The buildings face out to the east and west with both overhead <br />doors and man doors on these outward-facing sides. The two buildings are separated by 15 ft in <br />the middle of the site, with entry doors on those sides of the building as well. Each building is <br />divided into eight units, 26Ô x 50Ô each, for a total of 16 units in the project. <br /> <br />Uses <br />The I-1 Industrial Park district includes the following uses, among others: <br /> <br /> ÑMini-storageÒ is allowed as a Conditional Use. Mini-storage is not defined in our code. A <br />dictionary definition says itÔs a building with individual storage units to be rented or leased. <br />This fits what is being requested. <br /> ÑWarehousing/distributionÒ is a Permitted Use in I-1, which would typically mean one <br />business, not storage for many individual businesses in different units. Mini-storage, with <br />individual units, by CUP is how we are processing this request. <br /> Permitted uses in I-1 include offices Ï Business and Professional Office and Construction <br />Trade Offices Ï as well as car wash, construction yard, machine shop/repair (inside <br />building), research, and storage accessory to a Permitted Use. <br /> There are many other Conditional Uses allowed in I-1, including manufacturing/processing. <br /> Retail sales and residential uses are prohibited in the I-1 district. <br /> <br />The CUP for the Max Storage mini-storage use would therefore allow storage in individual units, but <br />also any other Permitted Use in I-1 would be allowed with no further zoning approval from the City, <br />other than a building permit, if there were no changes to the exterior of the building or the site. <br /> <br />Parking <br />Parking is not specifically noted on the site plan and should be spelled out carefully to avoid <br />confusion or problems on site: <br /> <br /> Required parking ratios per code are: <br />o Office 5/1000 sq ft <br />o Manufacturing 3/1000 <br />o Industrial/Warehousing 2/1000 sq ft <br /> <br /> At the minimum ratio of 2/1000 for warehouse (storage) uses, the site needs 42 parking <br />spaces, or 2.6 per unit. If more intense uses are proposed, more parking would be required. <br /> <br /> There are two options for parking Ï up against the building or opposite the building. <br /> <br /> Against the building is probably preferable for most tenants and would allow easier <br />maneuvering of vehicles into the overhead doors in most places on site but provides less <br />parking than opposite the building. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.