My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-09 Administrator Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2022
>
2022-03-09 Administrator Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 8:46:09 AM
Creation date
3/8/2022 8:46:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Centerville Elementary School Expansion <br />Progress continues. The work will be complete this summer and ready for students in the fall. <br /> <br />stnd <br />Old Mill Estates 1 and 2 Additions <br />A Letter of Credit reductionwas granted at the last City Council meeting. The city still retains <br />more than $80,000 in a letter of credit as well as a 2-year warranty bond on the public <br />improvements. <br /> <br />The City is in discussion with the homeowner near the cul-de-sac on Old Mill Court, exploring <br />alternative routes for the trail. The city will continue to hold security for the completion of the <br />trail until this process plays out and the trail link is completed. <br /> <br />th <br />Centerville Storage (20Ave. Mini Storage) <br />A few items remain to be completed prior to allowing the facility to be opened, including some <br />fence work. <br /> <br />Bay View Villas (Waterworks Site) <br />The vast majority of the project work is now done. Some lakeshore plantings and final <br />landscaping items remain. Mailboxes are now in and the pond has been dredged to final grade. <br /> <br />Atlas Villas Memory Care Project (1825 Main Street) <br />The developer advised that they are completing interior finishes in about 3 weeks and opening for <br />business around June 1st. <br />Rehbein Commercial <br />Infrastructure work is now, largely complete, with the sewer, water and stormwater having <br />been installed. The street (Michaud Way) has been constructed up through the base course of <br />asphalt. The wearing course will be installed next year if there are no settlements or other <br />issues. The contractor is working through punch list items and will be completing the trail and <br />sidewalks next year. <br /> <br />Kwik Trip <br />Staff has been working with Kwik Trip’s staff to get securities and other agreements in place. <br />The owner has communicated that construction could begin by mid-summer, 2022. <br /> <br />Norbella Senior Living <br />Norbella has now broken ground on the site, installing utilities and excavating for the <br />foundation and parking lot. Work will continue within the building through the winter. <br /> <br />Peterson Shores <br />The developer has signed necessary agreements and is authorized to file the plat. <br />Rehbein Industrial <br />Work on the extension of Fairview Street has been completed, up through the gravel base of <br />the road, including sewer, water and stormwater utilities. Curb and paving will follow in the <br />Spring. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.