April 5, 2022 <br />Centerville Planning & Zoning Commission <br />Page 9 of 9 <br />RE: Banjo Distribution Center, Preliminary Review – CUP, Site Plan, Plat <br />Lighting <br />Lighting is proposed on the building, under the van loading canopy, and around the parking <br />areas on light poles. The lighting plan indicates the light poles will be 24’-8” or 37’-0” in height. All <br />lighting is downcast cutoff type fixtures with less than 0.5 footcandle at all points on the perimeter <br />of the site. The lighting under the van loading canopy is understandably brighter, but the <br />photometric plan indicates that light levels fall off quickly to typical parking lot level of about 2 <br />footcandles within a short distance out from the canopy. <br />Signage <br />Signage is proposed on the building and on two freestanding signs at the entrances. Signage will <br />be reviewed in more detail in line with the City’s standards. <br />RECOMMENDATION <br />We have no recommendation at this time on the project but suggest the Commission pose <br />questions they want answered and consider the issue of processing the application as a PUD. <br />60-DAY RULE <br />The Site Plan and Plat applications were submitted and fees paid March 9, 2022. The deadline for <br />final action on the Site Plan is May 9, 2022; the preliminary plat has a separate 120-day deadline <br />which is July 8, 2022. <br />The CUP application was submitted and fees paid on March 29, 2022. The 60-day deadline for <br />final action on the CUP is May 29, 2022, which can be extended if more time is needed for review. <br />With consideration of a PUD vs. CUP, the applications may need to be revised in any event. <br />As noted above, with amended CUP applications or a PUD application, the deadlines may <br />change. <br /> <br />