Laserfiche WebLink
_ ... r yam',,,' •. <br />Long -Term Regional Considerations: _ <br />1) Leave as is and monitor need/signal <br />timing as development continues - <br />2) Convert the thru lane to a left -turn lane <br />(dual lefts) and convert the right -turn lane ,^ ; <br />to a shared right/thru lane or add a Near Term: Optimize signal timing and <br />dedicated right -turn lane phasing along Main Street <br />3) Convert the thru lane to a shared left/thru <br />lane and implement split signal timing <br />F[I <br />.. . <br />Potential Consideration: Widen roadway to <br />accommodate a raised median and <br />appropriate travel lanes; may want to be <br />wide enough to receive dual -left turn lanes <br />in the future or a realigned thru lane from <br />north of Main Street <br />Long Term Consideration: Close this access <br />and/or create a shared access with the <br />business to the north? <br />TAd <br />2 <br />Potential Consideration: Modify access <br />to right-in/right-out, or close? <br />is <br />Infrastructure Considerations <br />Project Banjo Traffic Study <br />Long Term Consideration: Upgrade <br />21 st Avenue to a 3-lane facility from <br />Commerce Drive to Main Street <br />Figure 12 <br />