My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-25 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2022
>
2022-05-25 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 2:09:15 PM
Creation date
5/24/2022 2:08:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.Stormwater Area Charge (City) <br /> B. Park Dedication Fees (City) <br /> 22. FIXTURE INSTALLATION, ACCEPTANCE AND WARRANTY <br /> A. The Owner shall be responsible for the cost and installation of the Public <br />Improvements consistent with the Development Plans and specifications approved by the City. <br />Before the City signs the Final Plat, the Owner shall take responsibility for procurement and <br />installation of same. The cost of the Public Improvements is set forth in the attached table, Exhibit <br />D. <br /> B. Within 60 days after Owner delivers a complete set of reproducible “as <br />constructed” plans and a set of electronic format “as constructed” plans for the Owner installed <br />Public Improvements and a letter requesting acceptance by the City of such improvements, City <br />shall review said Public Improvements and consent to and accept the improvements or provide <br />Owner with a written notice of work that is unacceptable and what is required to make the work <br />acceptable to the City. Upon completion of corrections to the unacceptable work, the developer <br />shall, again, notify the City in writing and request acceptance of the work. The timeline above, <br />then resets. If the City fails to provide a written notice of unacceptable work within 30 days, then <br />the City shall be deemed to have accepted the Public Improvements identified in the Owner’s <br />written request for acceptance. <br /> C. The Owner warrants all Public Improvements required to be constructed by it <br />pursuant to this Agreement against poor material and faulty workmanship. The warranty period <br />for underground utilities is two (2) years from the date of acceptance by the City. If all Public <br />Improvements are installed by one contractor, the warranty period shall commence after the final <br />wear course has been completed and the City has accepted the streets unless installation of the <br />DEVELOPMENT & SUBDIVISION AGREEMENT <br />CENTERVILLE AND BANJO <br />Draft Version 05/20/2022v3 – for Council Packet- Page 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.