Laserfiche WebLink
May 25, 2022 <br />Centerville City Council <br />Page 10 of 18 <br />RE: Banjo Distribution Center, PUD, Preliminary & Final Plat <br />4)A wall, fence, or berm would not be effective in noticeably reducing noise from the site. <br />5)Existing noise levels should be measured before construction begins, then again after the <br />site is operational to confirm the conclusions of the study, and to help the City decide if <br />additional mitigation measures might be warranted. <br />Noise contour maps form Kimley-Horn 5-17-22 memo <br />Despite the conclusion of the noise <br />study, there is the possibility that <br />residents may find the intermittent <br />noise throughout the night to be <br />disruptive. The applicant has indicated <br />a willingness to build a sound wall with <br />the project, if that was something <br />important to the community. <br /> <br />