My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-01 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2022
>
2022-06-01 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2022 1:34:20 PM
Creation date
5/27/2022 1:34:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2022 <br />Preparing for EABGrants <br />ExhibitA:Applicationevaluationscoresheet <br />SelectionCriteriaandWeight <br />Thesteeringcommitteewillbereviewingeacheligibleapplicationon a 100-pointscale.Scoreswillbe <br />used to develop final recommendations. Applicants are encouraged to score their own applications <br />using the evaluation score sheet before submitting the application. While not required, this step may <br />helpapplicantsmeetthe criteriathat grantreviewerswillbescoring. <br />ApplicationstothePreparing for EAB Grantswillbeevaluatedandrankedaccordingtothe <br />followingcriteria and points: <br />1.ProjectOverviewandNeed <br />Applicationisclearandcomplete <br />Communityhas a readinesstotakeona projectoftheproposedscopeandsize <br />25 <br />Projectfocusesonsignificantpublicsafetyconcerns <br />2.ProjectTimeline <br />Timelineprovidesspecificdatesforallactivities <br />Timelineiseasytoreadandcomprehend <br />20 <br />Timeline follows best management practice of not removing ash trees when EAB are <br />actively flying(no ashremovalsMay-September) <br />3.ProjectBudgetandBudgetExplanation <br />Budgetexplanationprovidesspecificdollaramountsforanticipateduse15 <br />Budgettotalsequalamountrequested <br />Financiallyrealisticandcosteffective <br />Project seeks to replant more trees than removed <br />4.ProjectImpactsonPriorityPopulations <br />Planning and collaboration clearly serves and includes areas of concern for <br />environmental justice (communities with higher populations of low-income <br />residents,peopleofcolor,including tribalcommunities,orboth) <br />20 <br />Communities in areas of concern are engaged and input is incorporated <br />prior to project implementationand through the project <br />Applicant demonstrates actionable items for these communities (examples <br />include program focal areas, outreach offered in multiple languages, added <br />inclusion),impactsondiversepopulationsareclear andtangible <br />5.Communications <br />Communicationstrategiesdirectlyrelatedtoprojectaccomplishments,activities,10 <br />or both, and multiple forms of communication are listed with potential to reach <br />thepublic <br />EAB-relatedmessagingincludeddesigned to slow the spread <br />6.KeyPersonnel <br />Key personnelarelisted with corresponding project roles <br />Allcertificationsandeducationdegrees arelistedforstafforcontractors <br />10 <br />A highscoringcommunitywillhavestafforcontractorswith a degreein a related <br />field,ora combination/multiplestaffwithISACertifiedArborist, TCIAaccreditations, <br />orboth <br />Total100 <br />Page7of7 <br />January 2022 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.